Tulu Kapi gold project, Ethiopia
Name of the Project
Tulu Kapi gold project.
Location
Ethiopia.
Project Owner/s
Kefi Minerals.
The Tulu Kapi Mines Share Company will hold the Tulu Kapi project.
Project Description
A definitive feasibility study (DFS) update for the project was completed in May 2017.
The 2017 DFS incorporates due diligence and refinements since the 2015 DFS, and provides increased confidence in the company’s plans to develop the project.
The 2017 DFS has similar outcomes to those of the 2015 DFS.
The mining method planned is conventional openpit drill-and-blast, load-and-haul, reflecting a semiselective mining approach, whereby a bulk mining approach is applied to 79% of ore, or 95% of all material, and a selective mining approach to 21% of ore, or 5% of all material.
The processing plant comminution circuit, refined and primary semiautogenous (SAG) mill, and secondary ball mill circuit have been replaced with a larger SAG‐only circuit. The DFS‐approved grind size for the processing plant has increased from P80 = 75 μm to 150 μm.
The designs for the tailings storage facility (TSF) and water storage dams have also been revised. The TSF has been relocated downstream to reduce capital costs, with no reduction in capacity for a neutral balance.
New access roads have also been refined to decrease capital costs.
Key planning assumptions that have been introduced since the 2017 DFS include:
reworked production plans for years 1 to 3, with forecast gold production expected to expand from 115 000 oz/y in the 2017 DFS to 145 000 oz/y;
expanding the capacity of the project’s processing plant to between 1.9-million and 2.1-million tonnes a year, depending on the hardness of the ore; and
recasting the mining plans to allow for faster mining, intensified grade-control drilling and enhanced flexibility to switch between bulk mining and selective mining.
Various components remain unchanged from the 2015 DFS, including geology and mineralisation (ore reserves and mineral resources), metallurgical testwork data, and environmental and social permitting.
Mining the underground deposit below the planned openpit has not yet been fully considered and will be addressed in due course.
A preliminary economic assessment completed in early 2016 evaluating the current indicated resource – 1.1-million tonnes grading 5.6 g/t gold – has indicated that the addition of an underground mine has the potential to increase total openpit and underground gold production to more than 150 000 oz/y over four years.
The orebody remains open and further potential will be added.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The net present value of the project at the start of construction on a 100% basis is estimated at $175-million. The internal rate of return has increased from 22% in the 2015 DFS to 60% in the 2017 DFS.
Payback is three years.
Capital Expenditure
The $160-million total funding requirement for the project is consistent with Kefi’s recent guidance for required funding.
The additional $12-million funding required for the reworked production plans, and the plant and infrastructure expansion announced at the end of October 2017, have been offset by other savings and financier Oryx Management’s offering to expand its facility from $135-million to $140-million.
In addition, the reworked estimates also reflect the strategy agreed with Oryx Management to install greater processing capacity from the outset to achieve:
• a quicker cashflow from the openpit and capacity to process additional ore from targeted satellite deposits, and
• greater protection against downside risks by facilitating the faster processing of lower-grade ore from the openpit.
Planned Start/End Date
Construction of Tulu Kapi is expected to start in early 2019 and commissioning is expected for the second half of 2020.
Latest Developments
Kefi Minerals has confirmed that development of the Tulu Kapi gold mine will start in October.
The mine has a 24-month development schedule and should achieve full production in 2021.
Key Contracts and Suppliers
Ausdrill (mine services).
On Budget and on Time?
Too early to state.
Contact Details for Project Information
Kefi Minerals, tel +90 232 381 9431, fax +90 232 381 9071 or email info@kefi-minerals.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















