https://www.miningweekly.com
Africa|Environment|Flow|Gold|Mining|Flow
Africa|Environment|Flow|Gold|Mining|Flow
africa|environment|flow-company|gold|mining|flow-industry-term

Triple Flag reports stable third-quarter performance

8th November 2022

By: Donna Slater

Features Deputy Editor and Chief Photographer

     

Font size: - +

TSX- and NYSE-listed gold-focused, emerging senior streaming and royalty company Triple Flag Precious Metals sold 19 523 gold-equivalent ounces (GEO) in the third quarter, down slightly from the 20 746 GEO sold in the corresponding period in 2021.

Of this, gold comprised 11 918 GEOs and silver 6 134 GEOs.

This resulted in revenue of $33.8-million, down from the $37.1-million of the third quarter of 2021, while cash costs were $165/GEO – broadly in line with the same period in 2021.

As such, the company declared a quarterly dividend of $0.05 a share, payable on December 15.

However, Triple Flag’s third-quarter net earnings of $12.8-million were higher than the net earnings of $5.1-million from the corresponding 2021 period; equating to adjusted net earnings of $13.3-million, compared with $13.7-million in the third quarter of 2021.

As such, the company’s operating cash flow in the period was $25.4-million, down from the $29.5-million of the third quarter of 2021.

Adjusted earnings before interest, taxes, depreciation and amortisation in the period were $26.1-million, down from the $29.5-million of the corresponding 2021 period.

“Our results from the third quarter were broadly in line with expectations and we are expecting our full-year GEO sales to be towards the low end of our guidance range of 88 000 GEO to 92 000 GEO,” says CEO Shaun Usmar.

“Our portfolio has delivered year-on-year GEO increases in gold streams and royalties to date,” he adds.

However, Usmar notes that silver GEOs have lagged, primarily as a result of changes in delivery timing from Cerro Lindo, which is producing silver in concentrate in line with Triple Flag’s expectations for this year.

Nonetheless, he says a combination of a higher gold/silver ratio and changes in the quotational period associated with offtake contracts have impacted the timing of Triple Flag’s stream deliveries by several months on average.

“This points to a short-term timing impact in contrast to the robust underlying operational performance of the mine and portfolio as a whole.

“Our asset margins remain strong at 90%, our cash costs of $165/GEO remain low, and our production base is diversified across 15 producing assets,” says Usmar.

He explains that, with almost 90% of its assets situated in the lowest half of their respective industry cost curves, Triple Flag’s mining partners are well-positioned to weather inflationary pressures and the current volatile commodity price environment.

In terms of loan facilities, Triple Flag, on September 22, extended the maturity of the $500-million credit facility by three years to August 30, 2026, and increased the uncommitted accordion from $100-million to $200-million, for a total availability of up to $700-million.

Under the amendment, the London Inter-Bank Offered Rate benchmark interest rate was replaced by the Secured Overnight Financing Rate; while all other significant terms of the credit facility remain unchanged.

Triple Flag’s streaming assets are located in South Africa, Australia, the US, Canada, Mongolia, Colombia and Peru.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 
Environmental Assurance (Pty) Ltd.
Environmental Assurance (Pty) Ltd.

ENVASS is a customer and solutions-driven environmental consultancy with established divisions, serviced by highly qualified and experienced...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.255 0.291s - 108pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: