Name of the Project
Tongo diamond project.

Location
The project is located in eastern Sierra Leone.

Client
Newfield Resources’ acquisition of Stellar Diamonds became effective from April 26, 2018.

The boards of both companies believe that the combination will create an enlarged and well-funded diamond development group, with a number of highly prospective licences in Sierra Leone and Liberia.

Project Description
The Tongo diamond project comprises two adjacent mining licences covering a combined area of 134 km².

A previously completed independent preliminary economic assessment (PEA) for the combined mining project demonstrated a financially robust and high-margin project with a 21-year life-of-mine (LoM). Only three of 11 kimberlite dykes on the properties have been categorised as resources to date – Tongo Dyke-1, Kundu and Lando – for 2.2-million tonnes and 4.5-million carats at a +1.18 mm cutoff.

The PEA was prepared on the basis of an underground mining-only scenario.

The current underground mine plan is configured as a series of declines from surface at Kundu, Lando and Tongo.

Mining levels will be interspaced at depths of 35 m, with the first levels being developed at 40 m below surface.

Based on the current resource models, Tongo will have 11 levels, Lando 10 and Kundu 5 during the LoM.

The orebodies will be accessed through 2 m × 2 m drives and crosscuts into stopes mined using traditional overhand shrinkage stoping mining methods. The ore will be drawn from access points and transported on underground locomotives and tipped into bins on an ore pass system. These bins will feed haulage trucks that will transport the ore to surface and the processing plant.

The existing 50 t/h processing plant at the Koidu mine will be relocated to Tonguma and further upgraded to serve as the processing plant for the new mine. This will save considerable time getting the project to production.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 10% discount rate, of $172-million, and an internal rate of return of 49%.

Value
The project has an expected capital expenditure of $31.8-million.

Duration
First production is expected within 12 months.

Latest Developments
Newfield Resources is, along with its technical partners PPM, SRK Consulting and Datamine, nearing completion of the front-end engineering design study for its Tongo diamond project.

The outcome of the study is expected to be released in the first quarter of this year.

Moreover, final mine optimisation is ongoing and is set to be completed shortly.

Newfield has been granted 25-year renewable mining licences for the 9.98 km2 area held by its subsidiary company Sierra Diamonds.

Box preparation for the portal entrance and decline development have also started.

Excavations and shaping of the boxcut for an access portal is aimed at maximising efficiency in the planned mine development schedule, Newfield executive director Karl Smithson has said.

The company has also exported 1 626 ct of diamonds for valuation, with up to 48% collection goods, which are diamonds with top colours in the D to G range.
 

In November 2018, Newfield Resources reported a Joint Ore Reserves Committee-compliant resource estimate of about 7.4-million carats, spread across four kimberlites, at its Tongo diamond project.

About 1.9-million carats, or about 25% of the updated in situ resource, is classed in the indicated category, which underlines a considerably higher confidence level in key geological and technical parameters.

The diamond grades and values, in particular for the Kundu and Lando kimberlites, point to some of the most “impressive kimberlites globally on a dollar-a-tonne rock value basis”.

The updated resource estimate is also predominantly limited to a depth of 230 m from the surface.

However, previous deeper drilling suggests there is potential for the global resource to be significantly increased in the future with more evaluation work.

The updated grade and value results will be incorporated into the mine optimisation work being undertaken as part of the current front-end engineering and design (FEED) programme on the Tongo project.

This programme remains on track for completion in the fourth quarter.

Key Contracts and Suppliers
Paradigm Project Management and SRK Consulting (FEED).

On Budget and on Time?
Not stated.

Contact Details for Project Information
Newfield Resources, tel +61 8 9389 8880 or tel +232 78 415163, or email info@newfieldresources.com.au.


 

 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

ZF Aftermarket
ZF Aftermarket

ZF Aftermarket is the after-sales division of the world-renowned German ZF group, a global leader in mobility technology.

VISIT SHOWROOM 
ABB Electrification
ABB Electrification

Electrifying the world in a safe, smart, and sustainable way, ABB Electrification is a global technology leader in electrical distribution and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.05 0.073s - 111pq - 2rq
Subscribe Now