https://www.miningweekly.com
Energy|Engineering|Gas|Mining|PROJECT|Water|Contracting
Energy|Engineering|Gas|Mining|PROJECT|Water|Contracting
energy|engineering|gas|mining|project|water|contracting

TNG brings processing facility closer to Mt Peake

30th September 2021

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – ASX-listed TNG on Thursday reported that it will progress the development of its flagship Mt Peake vanadium/titanium/iron project, in the Northern Territory, with a fully-integrated mining and processing operation within its existing mining leases.

The company told shareholders that the selection of the Mt Peake mine site for its downstream TIVAN processing facility (TPF) followed a detailed assessment of alternative sites.

The strategic assessment review included quantification of the potential operational, regulatory and commercial risks of having a consolidated and integrated mine site operation compared with a standalone TPF in Darwin.

“This is a very significant milestone for TNG and a significant development for our shareholders and all key stakeholders associated with the Mt Peake project,” said TNG MD and CEO Paul Burton.

“Following the detailed review of alternative locations for the TPF outlined in recent announcements, and taking into consideration factors such as energy supply and water processing, we intend to progress an integrated and consolidated plan with the TPF to be evaluated at the Mt Peake mine site.”

An integrated mine-beneficiation-processing facility was originally contemplated at the Mt Peake mine site in the initial project scoping study, however, at that time gas and water availability were considered inadequate to meet the project’s requirements.

As a result, a number of other sites were assessed for the location of the TPF, including Alice Springs, Tennant Creek, Pine Creek and Darwin. The company also considered an offshore site in Kuantan, Malaysia, and a site near Whyalla in South Australia.

“This is the most important change to the configuration of the Mt Peake project since the completion of the feasibility study and, importantly, it gives certainty to all of our key stakeholders, our project financiers, our shareholders and everyone else who has followed our journey to date,” Burton said.

“The colocation of the TPF at the mine site delivers a host of strategic and logistical benefits and, importantly, significantly de-risks our development pathway moving forward.

“We are now working with our key engineering and contracting partners to develop an updated project delivery schedule and to move ahead with permitting as quickly as possible,” said Burton.

Edited by Creamer Media Reporter

Comments

Showroom

Rittal
Rittal

Rittal is a world leading provider of top-quality integrated systems for enclosures, power distribution, climate control, IT infrastructure and...

VISIT SHOWROOM 
Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.193 0.227s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: