Titan cleared to start mining Sphaleros openpit
Toronto-listed Titan Mining has received the permit from the New York Department of Environment and Conservation (NYSDEC), allowing it to begin mining activities on the Sphaleros openpit mine project at the Empire State mine (ESM).
“We are pleased that NYSDEC has recognised the thoroughness of our plan, as well as our commitment to sustainable and responsible development. Completion of this infrastructure project will allow ESM to increase throughput to the existing mill beginning in the first half of 2023,” GM Joel Rheault commented.
The Sphaleros openpit incorporates the Hoist House, Pump House and Turnpike pits, comprising measured mineral resources of 105 000 t at a grade of 3.34% zinc, indicated mineral resources of 595 000 t at a grade of 3.09% zinc and inferred mineral resources of 217 000 t at a grade of 3.37%.
With this permit in hand, ESM is moving immediately to complete construction of a 1.8 mile haul road from the Sphaleros project to the existing mill facility and start waste stripping and site preparation around the openpits.
Titan also announced that it had entered into a fixed zinc pricing arrangement for 50% of the company’s budgeted zinc production for the remainder of 2022 at a price of $1.61/lb of zinc.
“The successful conclusion of these permits is a major step in delivering our goal of increasing mine throughput and payable pounds of zinc, as we maximise the extraction of the resource. Setting a price floor on 50% of our production for the balance of 2022 will ensure that we can cover our financial needs related to payment of dividends, capital costs associated with infrastructure construction and continued to reduction of our debt,” said Titan president and CEO Don Taylor.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation















