Tipton gas expansion project, Australia
Name of the Project
Tipton gas expansion project.
Location
The Tipton gas project is located 30 km west of Dalby, in Queensland’s Surat basin, in Australia.
Client
Arrow Energy, a joint venture between Shell and PetroChina.
Project Description
The project proposes the expansion of the Tipton gas project.
This will involve a significant upgrade of existing facilities, and will more than double production capacity from Tipton to more than 80 TJ/d.
The planned expansion of the Tipton operations is expected to involve 90 new wells in the initial phase and another 180 wells over the next 25 years – along with new gathering lines, an upgraded water treatment facility and four new compressors.
The proposed project follows a recent $600-million investment by Arrow in its Surat basin infrastructure, comprising the $500-million Daandine expansion project, commissioned in late 2016, and the start of a $100-million Produce the Limit (PtL) project earlier this year, to expand capacity at its Daandine and Tipton fields.
The Daandine, PtL and Tipton expansion pro-jects will bring Arrow’s Surat gas production to more than 170 TJ/d, for domestic and export use.
Jobs to Be Created
Not stated.
Net Present Value/Internal Rate of Return
Not stated.
Value
Not stated.
Duration
Not stated.
Latest Developments
Arrow Energy announced last month that it would undertake the front-end engineering design (FEED) phase for the expansion of the Tipton gas project.
Shareholders will consider a final investment decision once the FEED has been completed.
Key Contracts and Suppliers
Not stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Arrow Energy, tel +61 400 693 248 or email media@arrowenergy.com.au.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation