https://www.miningweekly.com
Business|Cable|Coal|Export|Freight|rail|Resources|SECURITY|Transnet|Maintenance|Products|Infrastructure|Operations
Business|Cable|Coal|Export|Freight|rail|Resources|SECURITY|Transnet|Maintenance|Products|Infrastructure|Operations
business|cable|coal|export|freight|rail|resources|security|transnet|maintenance|products|infrastructure|operations

Thungela lowers production guidance owing to deteriorating rail performance

18th October 2021

By: Tasneem Bulbulia

Senior Contributing Editor Online

     

Font size: - +

JSE-listed coal exporter Thungela Resources says that, following an initial recovery in the performance of Transnet Freight Rail (TFR) subsequent to the yearly maintenance shutdown in July, rail performance has continued to deteriorate in the second half of the year.

Thungela consequently implemented actions to mitigate the impact on its business. Third-party sales, which use the rail entitlement of Thungela, have been reduced from 926 000 t in the first half of the year to an anticipated 25 000 t for the second half of the year.

The group has also optimised its export equity sales mix, prioritising the railing of lower volumes of higher-margin products, recognising continued rail constraints, it adds.

Moreover, it notes that the coal industry has assisted TFR to implement improved security measures, which are expected to contribute to an improvement in rail performance.

This follows several instances of cable theft and related rail interruptions.

The coal industry continues to engage TFR on opportunities for further improvement.

Notwithstanding the actions already taken by Thungela and TFR, given the current and expected rail performance levels, some of its operations may become constrained as a result of reaching stockpile capacities from November.

Thungela says it continues to monitor rail performance and its potential impact on its operations and to explore further actions that could be required to mitigate such impacts.

Full-year export saleable production guidance is accordingly moderated to 14.8-million to 15.2-million tonnes, from the 15-million to 16-million tonnes previously guided.

Unless there is an improvement in rail performance, Thungela is expected to build additional export inventory stock levels of about 1.3-million tonnes during the period.

Thungela says it continues to work with the rest of the South African coal industry and TFR to improve the levels of infrastructure availability and performance.

Thungela’s share price on the JSE fell by more than 4% on Monday morning.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Magni SA
Magni SA

Magni SA is committed to developing the safest Telehandlers available to our customers for underground and surface mining, construction, forestry,...

VISIT SHOWROOM 
Rentech
Rentech

Rentech provides renewable energy products and services to the local and selected African markets. Supplying inverters, lithium and lead-acid...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hyphen, Eva mine, ferrochrome price make headlines
Hyphen, Eva mine, ferrochrome price make headlines
27th March 2024
Resources Watch
Resources Watch
27th March 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.116 0.156s - 110pq - 2rq
Subscribe Now