Project Description
A feasibility study on Stage 1 of the Thunderbox operations has shown robust economics over an initial 4.5-year mine life. It further envisages the development of a large openpit on the Thunderbox deposit, delivering 597 000 oz.
The start of mining will coincide with the completion of the Whirling Dervish openpit, allowing for a seamless integration between operations.
Several opportunities exist to extend the project life beyond Stage 1, including a bulk underground mine at Thunderbox and satellite openpit opportunities.
Stages 2 and 3 could potentially extend production to more than one-million ounces over an eight-year mine life at an average production rate of 126 000 oz/y.
Net Present Value/Internal Rate of Return
Stage 1 has a net present value, at an 8% discount rate, of A$120-million and an internal rate of return of 59%.
Value
A$65-million.
Duration
The project was slated to produce its first gold in June 2016.
Latest Developments
Commissioning of the 2.5-million-tonne-a-year processing facility at the Thunderbox gold project has started.
The first ore has been introduced into the grinding circuit, after the refurbishment of all key areas of the processing plant, crushing, grinding and classification, leaching and adsorption.
“We remain positioned to complete commissioning and ramp-up to steady-state output ahead of the schedule and budget outlined in our March 2015 feasibility study,” MD Raleigh Finlayson has said.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
The project is ahead of schedule and within budget.
Contact Details for Project Information
Saracen Mineral Holdings, tel +61 8 6229 9100 or fax +61 8 6229 9199.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation