https://www.miningweekly.com

Thunderbox gold project, Australia

16th October 2015

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Thunderbox gold project, Australia.

Client
Saracen Mineral Holdings.

Project Description
A feasibility study on Stage 1 of the Thunderbox operations has been completed, with the study showing robust economics over an initial 4.5-year mine life. It further envisages the development of a large openpit on the Thunderbox deposit, delivering 597 000 oz.

The start of mining will coincide with the completion of the Whirling Dervish openpit, allowing for a seamless integration between operations.

Several opportunities exist to extend the project life beyond Stage 1, including a bulk underground mine at Thunderbox and satellite openpit opportunities.

Stages 2 and 3 could potentially extend production to more than one-million ounces over an eight-year mine life at an average production rate of 126 000 oz/y.

Net Present Value/Internal Rate of Return
Stage 1 has a net present value, at an 8% discount rate, of A$120-million and an internal rate of return of 59%.

Value
A$65-million.

Duration
First gold from Stage 1 is planned for July 2016.

Latest Developments
The development of the Thunderbox mine is about three months ahead of schedule and Saracen has previously said that first gold production is expected during the June 2016 quarter.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
The project is ahead of schedule.

Contact Details for Project Information
Saracen Mineral Holdings, tel +61 8 6229 9100 or fax +61 8 6229 9199.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

North Ridge Pumps
North Ridge Pumps

North Ridge Pumps is an independent manufacturer of pumps. We have a proven track record for product support and customer service throughout the...

VISIT SHOWROOM 
Rittal
Rittal

Rittal is a world leading provider of top-quality integrated systems for enclosures, power distribution, climate control, IT infrastructure and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.047 0.372s - 111pq - 2rq
Subscribe Now