Thunderbird mineral sands project, Australia

19th March 2021

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Thunderbird mineral sands project.

Location
The project is located near Derby, in Western Australia.

Project Owner/s
Kimberley Mineral Sands (KMS), a joint venture (JV) between Sheffield Resources and Yansteel.

In March 2021, Sheffield Resources concluded the JV transaction with Yansteel over the Thunderbird project.

The companies signed a nonbinding term sheet in 2020 to form a JV, under which Yansteel will invest A$130.1-million to acquire a 50% stake in the mineral sands project.

With lender agreement in support of the transaction, and Sheffield’s receipt of Yansteel’s A$130-million investment to acquire a 50% interest in the JV vehicle, the project is now jointly owned by both companies.

Project Description
A bankable feasibility study (BFS) update completed on the project in July 2019 confirmed Thunderbird’s status as a world-class mineral sands project and demonstrated a lower-risk, technically stronger project with robust financial metrics.

The BFS update set out to materially improve project financial metrics by rescoping the project to reduce capital expenditure, increase zircon production to meet strong global demand as the structural supply deficit widens, and supply primary ilmenite to the high-growth chloride slag market.

The mining and processing rate increased by 38%, from 785 dry tonnes an hour to

1 085 dry tonnes an hour at the wet concentrate plant (WCP), targeting average zircon production of 202 000 t/y over the 37-year life-of-mine. This compares with zircon production of 145 000 t/y over a 42-year mine life in the 2017 BFS, consequently elevating Thunderbird into the top tier of global zircon producers.

The BFS update followed a similar project development strategy described in the 2017 BFS using a conventional dozer trap mineral sands mining and processing operation, but with an increase in the Stage 1 mining rate from 8.5-million tonnes a year (single mining unit) to 10.4-million tonnes a year (single mining unit).

The duplication of a second mining unit and process stream in Year 5 takes the total mining rate to 20.8-million tonnes a year, up from 17-million tonnes a year in the 2017 BFS. The low-temperature roast ilmenite circuit was removed and the project was forecast to export unroasted primary ilmenite.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The July 2020 BFS update estimated a pretax net present value (NPV), at a 10% discount rate, of A$1.13-billion and an internal rate of return of 30.1%, compared with an NPV of A$676-million and an internal rate of return of 24.9% in the 2017 BFS.

Capital Expenditure
Project capital decreased from A$463-million in the 2017 BFS to A$392-million in the BFS update.

Planned Start/End Date
Not stated.

Latest Developments
KMS plans to complete a final bankable feasibility study for the Thunderbird project over the coming months, ahead of concluding project finance arrangements, with a final investment decision expected during 2021.

Sheffield said in 2020 that it would rethink its approach to the Thunderbird project, and would change the scale and product mix to reduce capital costs and provide a more readily financeable project.

A small range of development strategies was subsequently identified, including a zircon-rich product stream in conjunction with alternate ilmenite streams.

Key Contracts, Suppliers and Consultants
GR Engineering (design and construction of the mineral processing plant, as well as the supporting infrastructure).

Contact Details for Project Information
Sheffield Resources, tel +61 8 6555 8777, fax +61 8 6555 8787 or email info@sheffieldresources.com.au.

Edited by Creamer Media Reporter

Comments

Projects

IMAGE OF GOLD BARS
Berg gold project, Canada
Updated 4 hours ago By: Sheila Barradas

Showroom

Yale Lifting Solutions
Yale Lifting Solutions

Yale Lifting Solutions is a leading supplier of lifting and material handling equipment in Southern Africa. Yale offers a wide range of quality...

VISIT SHOWROOM 
Alco-Safe
Alco-Safe

Lion Alcoblow ® - High speed breathalyser

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Resources Watch
Resources Watch
14th May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.155 0.21s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: