Thorny River diamond dyke project, South Africa
Name of the Project
Thorny River diamond dyke project.
Location
The project is a consolidation of the Frischgewaagt, Hartbeesfontein and Doornrivier properties, in Limpopo, South Africa.
Project Owner/s
Botswana Diamonds.
Project Description
Thorny River comprises the eastern extension of the kimberlite dyke and/or pipe systems on which the Klipspringer and Marsfontein mines are located, both of which have been economically mined.
The project has a modelled in situ grade range of 46 carats per hundred tonnes (cpht) to 74 cpht and a diamond value range of $120/ct to $220/ct.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
Not stated.
Capital Expenditure
Not stated.
Planned Start /End Date
Not stated.
Latest Developments
Botswana Diamonds has completed the intensification drilling programme on the Frischgewaagt and Hartbeesfontein farms, which form part of its Thorny River diamond dyke project.
The intensification drilling programme comprised 33 holes and 1 282 m of drilling which, together with previous work, has resulted in a total drilled depth of 3 299 m in five areas on the two farms.
A bulk sampling mining programme will start after the necessary approvals have been received. These are expected during the second quarter of the year.
Botswana Diamonds has said that a bulk sampling target of 3.9 km of linear kimberlite fissure intersection has been identified from the results, with intersections of up to 18 m, from 4 m below surface.
Areas hosting possible blows have also been identified and these will form part of the bulk sampling area, which is adjacent to that from which a bulk sample was taken in early 2018, and which indicated diamond values of between $120/ct and $220/ct, as well as grades of between 46 carats per hundred tonnes (cpht) and 74 cpht.
Following refurbishment, wet commissioning has been concluded on a nearby kimberlite treatment facility where the bulk samples will be processed.
Early-stage work is also progressing on potential secondary diamond deposits in the project area, with several targets identified.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Botswana Diamonds, tel +353 1 833 2833/+353 1 833 2833, fax +353 1 833 3505 or email info@botswanadiamonds.co.uk.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation
















