https://www.miningweekly.com
Exploration|Financial|Mining|PROJECT|Resources
Exploration|Financial|Mining|PROJECT|Resources
exploration|financial|mining|project|resources

Technical refresh adds to Buena Vista economics

21st August 2023

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – A technical refresh of the Buena Vista feasibility study has shown that the project could be moved to a 24/7 operating model and could increase its potential output from 450 000 t/y to 800 000 t/y at the same capital outlay.

ASX-listed Magnum Mining & Exploration undertook the technical refresh of the Buena Vista iron project, in Nevada, to fine-tune the 2011 feasibility study, as well as the recently announced scoping study.

While the scoping study aimed at a two-million-tonnes a-year concentrate production rate, the technical refresh focussed on accessing the highest grade resources with the goal of getting into production as quickly, and at the lowest production cost, as possible.

The recently released scoping study estimated that the project could produce 1.6-million tonnes a year of concentrate over a mine life of 25 years. The scoping study estimated a capital cost of between $182-million and $378-million and an operating cost of between $44/t and $90/t, with the internal rate of return ranging between 26% and 54%, and the net present value between $360-million and $745-million.

Meanwhile, the technical refresh stated that Buena Vista could be designed to potentially deliver an iron-ore product of more than 68% iron, based on recent test work.

Magnum said on Monday that the updated mine schedule for the technical refresh was also designed to support a 25-year mine life, similar to that in the scoping study, with a near constant grade feed to the beneficiation plant. The financial modelling supports an operation accessing higher-grade ores earlier, leaving the lower grade resource for later in the mine life, after the bulk of the capital has been repaid.

Work is currently underway to optimise the mine schedule to embrace this model and support the feed required for the designed 800 000 t/y concentrate production rate.

Edited by Creamer Media Reporter

Comments

Showroom

Rio-Carb
Rio-Carb

Our Easy Access Chute concept was developed to reduce the risks related to liner maintenance. Currently, replacing wear liners require that...

VISIT SHOWROOM 
SMS group
SMS group

At SMS group, we have made it our mission to create a carbon-neutral and sustainable metals industry.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (26/04/2024)
26th April 2024 By: Martin Creamer
Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.126 0.166s - 102pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: