Tasiast gold mine expansion, Mauritania
Name and Location
Tasiast gold mine expansion, Mauritania.
Client
Kinross Gold Corporation.
Project Description
The feasibility study completed on the Tasiast mine envisages the replacement of the existing 8 000 t/d mill at the mine with a new 38 000 t/d mill using heavy fuel oil for power generation at site.
The new mill will consist of a primary crusher, a semiautogenous and ball mill grinding circuit, and a conventional carbon-in-leach (CIL) circuit. Existing dump-leach facilities will be phased out in 2019, but could be available for lower-grade ore in the future if it becomes economically viable or if new ore is discovered in near-mine deposits.
Value
The projected initial capital cost is $1.566-billion, including $182 million in contingency.
Duration
The project is expected to take three years to complete.
Latest Developments
Leading up to the potential construction decision in 2015, Kinross will continue with a value improvement programme focusing on:
• continuous improvement and refinement of the execution strategy,
• procurement strategies and opportunities,
• continuous improvements to the mine plan,
• evaluation of requirements for the owner’s team, and
• engineering, procurement and construction management strategies and requirements.
This will allow the project team to further improve and refine areas such as planning, procurement and project execution.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Kinross Gold Corporation VP: investor relations Tom Elliott, tel +1 416 365 3390 or email tom.elliott@kinross.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















