Taseko granted key state permit for Florence project
The Arizona Department of Environmental Quality has granted the Florence copper project an aquifer protection permit (APP), marking a key milestone in the advancement of Taseko’s next operating asset.
“With construction anticipated to commence in 2021, the timing could not be better with copper being highlighted as the metal of the future as the world aggressively transitions to a green economy,” commented CEO Russell Hallbauer on Wednesday.
When in production, Florence would produce 85-million pounds a year of copper at $1.13/lb at C1 cash costs over its 20-year mine life.
The project has an after-tax net present value (NPV), at an 8% discount, of $680-million at a copper price of $3/lb. At current copper prices, the NPV rises dramatically to $920-million, which is roughly three times Taseko’s current market capitalisation.
“We have de-risked the project significantly since its acquisition in 2014 and believe we are on the cusp of having one of the best low-cost, fully-permitted and financed copper projects in the world," said Taseko president Stuart McDonald.
He pointed out that the copper production facility would have an environmental footprint smaller than any conventional openpit or underground mining operation of its size, with water consumption 14 times lower, carbon emissions six times lower and energy consumption three times lower.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation
















