Tarcoola gold project, Australia
Name of the Project
Tarcoola gold project.
Location
The Tarcoola gold project is located in central South Australia, 165 km by road to the Challenger mine and about 190 km south of Coober Pedy and 600 km north-west of Adelaide.
Client
WPG Resources.
Project Description
An updated feasibility study on the Tarcoola gold project has shown substantially enhanced economic outcomes over the original heap-leach option announced to the market in September 2015.
The project has an ore reserve of 710 000 t at 3.1 g/t at 71 000 oz gold.
The project remains a small to medium-sized openpit gold mine, but has a much smaller footprint now, as there will be no leach pads or gold recovery circuit on site.
The ore will instead be hauled for treatment to the Challenger mine for treatment, supported by substantially reduced on- and off-site services and infrastructure.
Treatment through the Challenger carbon-in-pulp plant results in substantially increased gold recovery, now estimated to be 95%, up from the 81% for the original heap-leach option.
The feasibility study envisages conventional opencut mining, primarily from the Perseverance deposit, with a smaller pit in the Last Resource area at a production rate of about 350 000 t/y. It represents a sound case for the development of a project with a mine life of at least three years.
Jobs to be Created
The project will provide employment for 40 people.
Net Present Value/Internal Rate of Return
The updated feasibility estimates an ungeared, pretax net present value, at a 7.5% discount, of $39.6-million, and a return on investment of more than 350%.
Value
The cost of the project is estimated at $3.99-million.
Capital costs have been reduced by the use of existing buildings and infrastructure in the Tarcoola township, together with some additional leased infrastructure.
Duration
Mine construction and production is expected to start soon after the programme for environmental protection and rehabilitation has been approved, with first gold to be produced before year-end.
Latest Developments
WPG has started construction at the Tarcoola mine, transforming the junior into a midtier gold producer.
The board decision to mine follows approval by the South Australian Department of State Development of the project’s programme for environmental protection and rehabilitation payment into a significant benefit vegetation clearance offset account, and the lodgment and registration of the mine closure rehabilitation bond.
WPG will progress the project’s immediate development, with all contracts already being awarded, and the equipment necessary for work to start already mobilised to site.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
WPG Resources, tel +61 2 9251 1044, fax +61 2 9247 3434 or email info@wpgresources.com.au.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















