https://www.miningweekly.com

Tando speeds up drilling at SPD project, targets Jorc-compliant resource by end-October

27th September 2018

By: Marleny Arnoldi

Online News Editor

     

Font size: - +

ASX-listed junior exploration company Tando Resources has mobilised another diamond core rig at its SPD Vanadium project, in South Africa, with three rigs now drilling out the 513-million-tonne resource.

This will contribute to the publication of a Joint Ore Reserves Committee- (Jorc-) compliant measured resource for SPD by the end of October.

Tando is well advanced in its strategy to establish a Jorc-compliant resource, which is part of the milestones it needs to achieve to acquire 73% of the SPD project.

Other milestones include the completion of a scoping, prefeasibility and definitive feasibility study.

Phase 1 of the A$1.4-million drilling programme at SPD started earlier this month and is expected to be complete before the end of the quarter. Phase 1 comprises 18 holes for 1.6 km.

Phase 2, which is expected to include the drilling of 58 holes for 5.5 km, will entail upgrading the maiden Jorc-compliant resource to the indicated category.

Meanwhile, drilling of the vanadium pipes within a 3 km radius of the SPD deposit will start mid-October, simultaneously with the primary drilling at SPD. Sampling of these pipes in June returned high grades of vanadium, which highlighted the potential to underpin a low-cost direct shipping ore operation for Tando.

The SPD vanadium project is located in the Bushveld Complex, in South Africa’s Limpopo province.

Edited by Chanel de Bruyn
Creamer Media Online Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

ASTPM
ASTPM

Established in 1983, the ASTPM is an industry association and representative body of the welded carbon steel tube and pipe manufacturers of South...

VISIT SHOWROOM 
ATI Systems
ATI Systems

ATI systems comprises five divisions: electrical assemblies, drives and controls, feedback sensors, enclosures, and strip guiding.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.054 1.302s - 128pq - 2rq
Subscribe Now