Tampia gold project, Australia

29th June 2018

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Tampia gold project.

Location
The project is located in the wheatbelt of Western Australia.

Client
Explaurum.

Project Description
Tampia has a mineral reserve of 7.2-million tonnes grading 2.09 g/t and an updated mineral resource of 11.7-million tonnes grading 1.79 g/t gold. The project comprises a single openpit, within close proximity to the proposed plant site.

The mine plan is based on an optimised mining schedule, mining weathered (surface) and shallow fresh material first.

Mining activities will be undertaken by Explaurum using equipment on a dry hire con-tract basis, whereby all equipment necessary to meet the planned mining schedule is provided on an hourly rate and guaranteed availability basis, with management and staffing being the responsibility of the principal.

The proposed process plant is based on:

∞ primary crushing (direct truck dumping of ore in the jaw crusher with front-end loader backup);

∞ a single-stage semiautogenous milling comminution circuit;

∞ a gravity concentration and intensive leach reactor;

∞ flotation of sulphides (3% to 5% mass pull, including löllingite);

∞ ultrafine grinding and enhanced leaching of the flotation concentrate;

∞ a carbon-in-leach circuit; and

∞ elution electrowinning and smelting of gold doré.

The nominal throughput capacity is estimated at 1.5-million tonnes a year.

The project has an initial mine life of 5.3 years.

Potential Job Creation
None stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at an 8% discount rate, of A$125-million and an internal rate of return of 47%, with a payback of 18 months.

Value
Preproduction capital costs are estimated at A$119-million, including a A$10.8-million contingency.

Duration
Not stated.

Latest Developments
A bankable feasibility study is expected to be completed in October 2018, with construction, subject to development finance, regulatory and board approvals, expected to start in December 2018.

Key Contracts and Suppliers
ALS Metallurgy (assaying, mineralogy and metallurgical testwork); AMC Consultants (ore reserve, mine planning and geotechnical); CMW Geosciences (tailings storage facility design); Ecoscape Australia (flora and fauna surveys); E Precision Laboratory (rock strength testing); Gekko Systems (metallurgical testwork); Groundwater Resource Management (groundwater hydrology); Jenike & Johanson (processing oreflow properties); JT Metallurgical Services (metallurgical programme management); Kenex (Geology); MBS Environmental (environmental, surface hydrology, soil survey); Metallurgy (metallurgical testing); MinEcotech (project management and mining); Mintrex (process plant and associated infrastructure design and costing, power options); NPV Consulting (financial modelling); Orway Mineral Consultants (comminution modelling); R & E O’Connor (aboriginal and European heritage); Rockwater (hydrology) and RSC Global (resource estimation).

On Budget and on Time?
Too early to state.

Contact Details for Project Information
Explaurum, tel +61 7 3333 2722 or email info@explaurum.com.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

ASTPM
ASTPM

Established in 1983, the ASTPM is an industry association and representative body of the welded carbon steel tube and pipe manufacturers of South...

VISIT SHOWROOM 
Virtual Gas Network (Pty) Ltd
Virtual Gas Network (Pty) Ltd

Virtual Gas Network supplies compressed natural gas via a virtual gas distribution network.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.058 0.882s - 111pq - 2rq
Subscribe Now