T3 copper/silver project, Botswana
Name of the Project
T3 copper/silver project.
Location
The project is located in the Kalahari Copperbelt, in Botswana.
Client
MOD Resources.
Project Description
The T3 project has a maiden mineral resource comprising 28.36-million tonnes, containing about 350 200 t of copper and 14.27-million ounces of silver. This includes a high-grade resource using a 1.5% copper cutoff grade, which consists of 8.48-million tonnes grading 2.16% copper and 30.6 g/t silver, containing an estimated 183 000 t of copper and 8.34-million ounces of silver. About 64% of the total T3 resource (0.5% copper cutoff) is in the indicated resource category and 88% of the total scoping study production target is in the indicated resource category.
A scoping study on the project envisages a two-million-tonne-a-year operation, producing about 21 800 t/y of copper and 665 000 oz/y silver over a ten-year mine life.
Jobs to be Created
Not stated.
Net Present Value/Internal Rate of Return
The project is expected to have a net present value, at a 10% discount rate, of $297-million and an internal rate of return of about 42%, with a payback of about two years.
Value
The base case model on the project will require a capital investment of $135-million.
Duration
The project is expected to enter production in the fourth quarter, subject to all regulatory approvals being received.
Latest Developments
MOD is planning a prefeasibility study in early 2017 and, if the study proves positive, a definitive feasibility study will follow, targeted for completion by the first quarter of 2018. Baseline environmental studies will also start, while exploration along strike and downdip from the T3 deposit will also be accelerated. MOD will acquire a second-hand plant and equipment to reduce costs.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
MOD Resources, tel +61 8 9322 8233, fax +61 8 9322 8077 or email administrator@modresources. com.au.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation