https://www.miningweekly.com

Superior Lake zinc project, Canada

11th October 2019

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Superior Lake zinc project.

Location
The project is located in Ontario, Canada.

Project Owner/s
Superior Lake Resources.

Project Description
A bankable feasibility study (BFS) has demonstrated Superior Lake as a highly economic project.

The project has probable reserves of 1.96-million tonnes grading 13.9% zinc, 0.6% copper, 0.2 g/t gold and 26.2 g/t silver.

The BFS is broadly based on the results of the restart study completed in October 2018.

The BFS proposes a plant throughput of 325 000 t/m, with a total life-of-mine of nine years and a total throughput of 2.2-million tonnes a month of ore at a grade of 13.7% zinc. The production rate equates to about 73 000 t/y zinc concentrate and 5 200 t/y copper concentrate.

The project will produce about 38 000 t/y of contained zinc and 1 400 t/y of contained copper. The processing plant has been designed to allow for a doubling of throughput by duplicating the main equipment, which can be relatively easily undertaken.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a net present value, at an 8% discount rate, of $158-million and an internal rate of return of 31%.

Capital Expenditure
Capital expenditure is estimated at $87-million.

Planned Start/End Date
Subject to successful completion of certain key activities, production is expected to start in 2021.

Latest Developments
Key activities for the next six months include finalising offtake agreements with selected parties; securing debt financing; value engineering to assess cost-reduction opportunities; delivering an optimisation study; completing the environmental licensing (closure plan) process; securing permits required for construction; and finalising agreements with First Nations groups.

Key Contracts and Suppliers
Primero (plant design, and operating cost and capital expenditure estimation), incorporating technical aspects from: Massa Geoservices (mineral resource estimate); Orelogy Consulting (mine planning and ore reserves); Mine Design Engineering (underground geotechnical); Nordmin Engineering (mine and general site infrastructure); SGS Canada (metallurgical testwork); Wood Canada (tailings and water studies); and Environmental Applications Group (environmental and permitting).

On Budget and on Time?
Too early to state.

Contact Details for Project Information
Superior Lake Resources, tel +61 8 6117 0479 or email info@superiorlake.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

ASTPM
ASTPM

Established in 1983, the ASTPM is an industry association and representative body of the welded carbon steel tube and pipe manufacturers of South...

VISIT SHOWROOM 
CSIR International Convention Centre (CSIR ICC)
CSIR International Convention Centre (CSIR ICC)

CSIR International Convention Centre (CSIR ICC) - the leading conference and events venue in Pretoria/Tshwane.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.044 1.07s - 111pq - 2rq
Subscribe Now