https://www.miningweekly.com
Construction|Mining|PROJECT|Resources|Surface|Drilling
Construction|Mining|PROJECT|Resources|Surface|Drilling
construction|mining|project|resources|surface|drilling

Strandline nearing wet commissioning at Coburn

1st September 2022

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Mineral sands miner Strandline Resources is preparing for the wet commissioning of its concentrator plant at the Coburn project, in Western Australia, as project construction was more than 90% complete.

The ASX-listed company on Thursday said it would make its first concentrate shipment in the coming quarter, with each shipment expected to be valued at around A$10-million at current spot prices.

“We are now in the home straight to achieve first production, with key aspects of construction and commissioning of the wet concentrator running several weeks ahead of schedule,” Strandline MD Luke Graham said.

“At this stage, we are on track to make our first shipment of heavy mineral concentrate in the coming quarter. The mineral sands market outlook remains very strong, with global supplies tight and demand buoyant.

“At current prices, we expect each shipment of concentrate to be valued at around A$10-million, assuming 10 000 t free-on-board shipments. These sales will bring forward cashflow and further de-risk the operational ramp-up,” said Graham.

He noted that the enhanced detailed mine schedule, incorporating the latest infill ‘grade control’ drilling and mine optimisation work, has mining starting from surface in the initial openpits.

Coburn has an ore reserves of 523-million tonnes and an initial mine life of 22.5 years at a planned average mining rate of 23.4-million tonnes a year, with the potential to extend its mine life to more than 37 years.

Edited by Creamer Media Reporter

Comments

Showroom

Rentech
Rentech

Rentech provides renewable energy products and services to the local and selected African markets. Supplying inverters, lithium and lead-acid...

VISIT SHOWROOM 
Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hyphen, Eva mine, ferrochrome price make headlines
Hyphen, Eva mine, ferrochrome price make headlines
27th March 2024
Resources Watch
Resources Watch
27th March 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.16 0.2s - 108pq - 2rq
Subscribe Now