https://www.miningweekly.com
Power|Service|Maintenance
Power|Service|Maintenance
power|service|maintenance

Stage 2 load-shedding to resume from 16:00

Stage 2 load-shedding to resume from 16:00

Photo by Creamer Media's Donna Slater

1st June 2021

By: Simone Liedtke

Creamer Media Social Media Editor & Senior Writer

     

Font size: - +

State-owned power utility Eskom will again be implementing Stage 2 load-shedding from 16:00 on June 1 to 05:00 on June 2.

This is owing to further breakdowns of generating units at the Kriel, Arnot, Majuba and Tutuka power stations over the past 24 hours, as well as delays in returning units to service at the Duvha and Tutuka power stations, Eskom says.

It adds that this bout of load-shedding will also assist in replenishing the emergency generation reserves, which have been used extensively over the past three weeks to avoid load-shedding during the day.

During this period, a generation unit each at Kusile and Arnot were returned to service.

This, however, is not sufficient to eliminate load-shedding for the rest of the week, Eskom warns, adding that the generation supply constraints will persist throughout the high winter demand period, which increases the likelihood of further load-shedding.

Breakdowns currently total 15 360 MW of capacity, while another 1 580 MW is unavailable owing to planned maintenance. Some generation units are expected to return to service starting this evening, which will help ease the strain.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 
WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

PGMs and green hydrogen make headlines
PGMs and green hydrogen make headlines
19th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.121 0.168s - 93pq - 3rq
1:
1: United States
Subscribe Now
2: United States
2: