https://www.miningweekly.com

Spence Growth Option project, Chile

1st May 2020

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Spence Growth Option (SGO) project.

Location
Spence copper mine, in the Atacama desert, northern Chile.

Project Owner/s
BHP.

Project Description
The SGO project will extend the mine life of the Spence opencut copper mine by more than 50 years. The project will convert 1.3-billion tonnes of measured and indicated mineral resources to hypogene sulphide ore reserves.

The project includes the design, engineering and construction of a conventional large-scale sulphide concentrator for copper and molybdenum with a 95 000 t/d nominal ore throughput capacity.

In addition, SGO will require a new 1 000 ℓ/sec desalination plant, located at Mejillones bay, and a 154 km water pipeline from the plant to the Spence mine site. These will be built and operated by a third party under a build, own, operate and transfer contract, which has been separately awarded, with nominal, undiscounted value of lease payment obligations over the 20-year contract term totalling $1.43-billion.

In the first ten years of operation, incremental production from SGO will be about 185 000 t/y of payable copper in concentrate and 4 000 t/y of payable molybdenum.

Potential Job Creation
During the construction phase, 5 000 jobs will be created.

Net Present Value/Internal Rate of Return
The project has an expected internal rate of return of 16% and an expected payback period of 4.5 years from first production.

Capital Expenditure
$2.46-billion.

Planned Start/End Date
First production is expected in the first half of the 2021 financial year.

Latest Developments
The project is on budget.

However, the schedule is under review, with first production potentially delayed until early in the 2021 calendar year, as a result of lower headcount on site, reflecting the decision to reduce the occupancy at the construction camp to facilitate physical distancing protocols, owing to Covid-19.

Consequently, the commissioning of the desalination plant could potentially be delayed a few months until the first half of the 2021 financial year.

The capitalisation of the lease will follow commissioning, with an update on the timing and recognition on the balance sheet to be provided in the June 2020 quarter operational review to be released in July 2020.

The overall project is 91% complete.

Key Contracts and Suppliers
None stated.

Contact Details for Project Information
BHP investor relations James Wear, tel: +1 713 993 3737, email: James.Wear@bhpbilliton.com.

 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 
Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.04 0.74s - 111pq - 2rq
Subscribe Now