https://www.miningweekly.com

Snorre expansion project, Norway

13th April 2018

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Snorre expansion project.

Location
The project is located on the Norwegian Continental Shelf (NCS).

Client
Partners in the Snorre field are Statoil Petroleum (33.27%), Petoro (30%), ExxonMobil Exploration and Production Norway (17.44%), Idemitsu Petroleum Norge (9.6%), DEA Norge (8.57%) and Point Resources (1.1%).

Project Description
The Snorre expansion is the largest improved oil recovery project on the NCS.

The project will increase recovery from the Snorre field by close to 200-million barrels.

The plan for development and operation involves a comprehensive subsea development, upgrading of the Snorre A installation, increased gas injection and gas import for injection.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Value
The project is estimated at more than NKr19-billion.

Duration
The project is expected to start production in 2021.

Latest Developments
None stated.

Key Contracts and Suppliers
TechnipFMC (subsea production system), Subsea 7 (fabrication and installation of the pipeline bundle system), Aibel (modification work on Snorre A) and Transocean (rig).

On Budget and on Time?
Too early to state.

Contact Details for Project Information
Statoil investor relations tel +47 51990000 or email irpost@statoil.com.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 
Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.047 0.76s - 111pq - 2rq
Subscribe Now