Siviour graphite project, Australia
Name of the Project
Siviour graphite project.
Location
Eyre Peninsula, South Australia.
Client
Renascor Resources.
Project Description
A scoping study for a proposed openpit mine and graphite production plant at the Siviour graphite deposit has shown encouraging project economics.
The project has total indicated and inferred resources of 80.6-million tonnes grading 7.9% total graphitic carbon for 6.4-million tonnes of contained graphite.
The scoping study considered multiple mine options based on a 20-year mine life, in which the entire life-of-mine graphite production target would be included within the existing indicated resource of Siviour.
Based on market requirements and potential capital raising capacity, a production rate of 123 000 t/y has been selected as the most viable scenario.
For the scoping study, conventional mining using drill-and-blast, load-and-haul, and crusher feed and in-pit wet disposal have
been adopted. Further studies into alternative mining and disposal methods will be considered in future studies.
Jobs to Be Created
Not stated.
Net Present Value/Internal Rate of Return
The project has an after-tax net present value, at a 10% discount rate, of $408-million and an internal rate of return of 59%, with a payback of 1.7 years from first production.
Value
Preproduction capital costs have been estimated at $106.5-million.
Duration
The project development schedule is based on completing feasibility studies in the second half of 2018, and, subject to receiving funding and relevant approvals, the project could start production in 2020.
Latest Developments
Renascor considers the project economics of the scoping study to be highly encouraging and to support additional developmental programmes and a more advanced feasibility study.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Too early to state.
Contact Details for Project Information
Renascor Resources, tel +61 8 8363 6989, fax +61 8 8363 4989 or email info@renascor.com.au.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation