Siana gold project, the Philippines
Name and Location
Siana gold project, the Philippines.
Client
Red 5.
Project Description
A technical study of Red 5’s mining strategy for the remaining life of the openpit operation at the Siana project has been designed to optimise the extraction of openpit ore reserves over its planned remaining life up to December 2017. This will maximise cash flows, mitigate possible geotechnical risks, and preserve the integrity and safety of the openpit operation.
The revised openpit mining strategy will recover an estimated 181 000 oz from July 1, of openpit mining using a progressively staged cutback of the East pit wall to allow for the base of the openpit to be mined to a final depth of 180 m below surface.
The project has indicated and inferred resources of 5.8-million tonnes grading 2.6 g/t of gold and 6.3 g/t of silver. Probable reserves are estimated at 1.9-million tonnes grading 3.5 g/t of gold and 8.2 g/t of silver.
Owing to the implementation of the revised openpit mining strategy, Red 5 has elected to remove 74 000 oz from its last reported openpit reserves, of which it aims to recover a portion in the underground phase of the operation.
Net Present Value/Internal Rate of Return
Not stated.
Value
Not stated.
Duration
Not stated.
Latest Developments
A new underground concept study has highlighted the potential to extract resources below the -130RL level and will form the basis of additional studies targeting the development of a future long-term underground mining operation at Siana.
This will include recovering as many of the ounces previously removed from the former openpit reserve as possible.
The study suggests that further work be undertaken to upgrade the existing reserve to a Joint Ore Reserves Committee 2012 status if future development of the underground mine at Siana is to be considered.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Red 5, tel +61 8 9322 4455, fax +61 8 9481 5950 or email info@red5limited.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation