https://www.miningweekly.com

Sconi cobalt/nickel/scandium project, Australia

8th February 2019

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Sconi cobalt/nickel/scandium project.

Location
North Queensland, Australia.

Client
Australian Mines.

Project Description
A bankable feasibility study (BFS) has shown Sconi to have robust project and financial metrics.

The project has a total combined ore reserve estimate of 33.89-million tonnes at 0.67% nickel, 0.10% cobalt and 42 parts per million scandium, supporting an initial life-of-mine of 18 years.

The cobalt, nickel and scandium resources are located in three main deposits – Greenvale, Lucknow and Kokomo – which can be extracted and processed on commercially attractive terms through the development of openpit mining operations and a central processing plant to be built at the site.

Ore will be fed into a two-million-tonne-a-year, latest-generation high-pressure acid leach and solvent extraction processing plant to produce 9 898 t/y of cobalt sulphate; 53 301 t/y of nickel sulphate and 89 t/y of scandium oxide.

The expected average feed grade of ore to the plant is 0.10% cobalt and 0.67% nickel, with exceptional recovery rates of 95.7% and 94.8% respectively.

Potential Job Creation
Construction of the project would create up to 500 jobs from 2019 to 2021, followed by more than 300 full-time positions once the mine, processing plant and associated infrastructure are in steady-state operation.

Net Present Value/Internal Rate of Return
The project has an estimated pretax net present value, at an 8% discount rate, of $1.31-billion and an internal rate of return of 21%, with a payback of 5.2 years.

Value
The project will cost about $974-million, including $110-million in contingency.

Duration
The project will take about 24 months to construct, with the processing plant expected to require a 27-month ramp-up schedule.

Latest Developments
None stated.

Key Contracts and Suppliers
Ausenco (BFS).

On Budget and on Time?
Too early to state.

Contact Details for Project Information
Australian Mines, tel +61 8 9481 5811 or email info@australianmines.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Sika South Africa
Sika South Africa

Sika South Africa is a trusted partner for the nation’s infrastructure, commercial, residential, and industrial sectors.

VISIT SHOWROOM 
ECG Engineering
ECG Engineering

ECG provides specialised electrical engineering services to the Mining, Utilities, Materials Handling and Industrial industries, with extensive and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.055 0.894s - 111pq - 2rq
Subscribe Now