https://www.miningweekly.com

Santos sees FY output at lower end of guidance

18th October 2013

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

  

Font size: - +

PERTH (miningweekly.com) – Oil and gas major Santos on Thursday warned that its output for 2013 would be at the lower end of its guidance as production was deferred from both the Chim Sao and Fletcher Finucane operations.

For the full year, Santos was expected to produce between 52-million and 55-million barrels of oil equivalent.

Despite the weaker full year outlook, the ASX-listed miner reported its highest oil production in six years during the three months to September, with crude oil production reaching 2.9-million barrels, up 15% on the previous quarter.

The increase in production was thanks to higher production from Fletcher Finucane and the Cooper basin.

Meanwhile, gas production for the quarter under review reached 55.3 PJ, or some 9.5-million barrels of oil equivalent, which was a 5% decline on the previous corresponding period, as higher production from the Darwin liquefied natural gas (LNG) project was offset by lower production in Bangladesh and the Otway basin.

Sales for the third quarter were also 7% lower than the previous corresponding period, but owing to the strong oil prices, Santos reported record sales revenue.

MD and CEO David Knox said that the record sales revenue of over A$1-billion demonstrated the performance of the existing business, as well as Santos’ efforts to progress the delivery of new projects and to create opportunity for the future.

“Excellent progress continues to be made on our two major growth projects, with Papua New Guinea LNG over 90% complete and Gladstone LNG over 65% complete. Both projects remain on schedule and capital cost estimates remain unchanged,” Knox said.

The Papua New Guinea LNG project was on track to deliver its first gas by the second half of 2014, while Gladstone was sanctioned for first delivery in 2015.

“We also continue to execute our strategy of focused growth in Asia, with the acquisition of an interest in the Ande Ande Lumut oil field offshore of Indonesia and interests in exploration permits in Papua New Guinea,” said Knox.

He noted that the Dua and Peluang development projects were also on track to deliver first oil and gas respectively, in the first half of 2014.

Edited by Mariaan Webb
Creamer Media Contract Publishing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

ZF Aftermarket
ZF Aftermarket

ZF Aftermarket is the after-sales division of the world-renowned German ZF group, a global leader in mobility technology.

VISIT SHOWROOM 
Vikela Aluvin (Pty) Ltd
Vikela Aluvin (Pty) Ltd

Complete range of security sealing solutions including security seals bags and labels.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.048 1.067s - 111pq - 2rq
Subscribe Now