Sanbrado gold project, Burkina Faso

10th August 2018

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Sanbrado gold project.

Location
The project is located about 90 km east-south-east of Ouagadougou, in Burkina Faso.

Client
West African Resources.

Project Description
Sanbrado has probable mineral reserves of 20.4-million tonnes grading 2.4 g/t gold containing 1.57-million ounces of gold.

The project comprises several openpits, all within a short distance of the plant site, and an underground mine accessed through a portal at the south-east end of the Mankarga 1 South (M1 South) openpit. The processing plant comprises a conventional semiautogenous, ball, crushing milling circuit, gravity and carbon-in-leach processing plant, with a nominal throughput capacity of two-million tonnes a year.

The Sanbrado combined openpit and underground feasibility study envisages an initial 11-year mine life, including 4.5 years of underground mining, with strong early cash flow and a rapid payback of capital.

The project will mine three deposits – Mankarga 1, Mankarga 3 (M3) and Mankarga 5 (M5). The M1 deposit will be mined in a north and a south pit.

The planned mining method for M1 South is uphole retreat bench stoping, with loose rock fill and cemented fill where necessary. The underground mine will be accessed through a decline starting from a portal at the M1 South pit and is planned to be developed using conventional two-boom jumbos capable of face advance and installation of ground support. The M1 South pit design incorporates an underground portal in the south-east wall. To allow for the earliest possible development of the underground workings, the southern section of the pit will be mined to a depth of 30 m to enable the portal to be developed in fresh rock. The final M1 South pit is 570 m long, 290 m wide and 120 m deep. The M1 North pit is 350 m long , 240 m wide and 90 m deep.

The M3 deposit also has two small, predominately oxide, pits less than 40 m deep.

Sanbrado is expected to produce an average of 211 000 oz/y of gold in the first five years of operation, with production averaging 133 000 oz/y over the mine’s life.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 5% discount rate of $567-million and an internal rate of return of 62%, with a payback of 12 months on preproduction capital.

Value
The project is estimated at $185.3-million.

Duration
Construction will start in late 2018, with a 20-month construction schedule leading to targeted gold production in mid-2020.

Latest Developments
West African Resources has progressed into the development phase at the Sanbrado gold project.

The company has also announced a key management appointment and project update. Matthew Wilcox will join the West African executive team as chief development officer in September, and will directly manage the construction of Sanbrado.

Prior to his appointment at West African, Wilcox was project director for the construction of Nordgold’s four-million-tonne-a-year Bissa gold project and eight-million-tonne-a-year Bouly gold project, both in Burkina Faso.

He was also the GM of Nordgold’s six-million-tonne-a-year Lefa gold project, in Guinea, and most recently, the project director for the construction of the 12-million-tonne-a-year Gross gold project, in Russia.

Key Contracts and Suppliers
Mintrex (study management, process plant and infrastructure design, metallurgical overview); Aurifex and ALS Ammtec (metallurgical testwork); OMC (comminution modelling); Knight Piésold (hydrology, hydrogeology, waste rock classification and tailings storage design); Knight Piésold and BEGE (environmental permitting); Knight Piésold, INGRID and BEGE (flora and social surveys); Peter O’Bryan & Associates (geotechnical assessment); Sylvatrop Consulting (surface surveys); International Resource Solutions (resource estimation); SCME (mine planning and optimisation, ore reserve statement); Capital Mine Consulting & Kenmore (underground mine design); and RL Advisory (financial modelling).

On Budget and on Time?
Not stated.

Contact Details for Project Information
West African Resources, tel +61 8 9481 7344 or email info@westafricanresources.com.

 

To watch Creamer Media's latest video reports, click here
 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
MBE Minerals SA (Pty) Ltd
MBE Minerals SA (Pty) Ltd

Your global lifecycle technology & service partner for materials & minerals processing equipment for coal, iron ore, copper, manganese & other...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.05 0.695s - 111pq - 2rq
Subscribe Now