Riacho dos Machados mine, Brazil
Name of the Mine
Riacho dos Machados (RDM) mine.
Location
Minas Gerais state, Brazil.
Mine Owner/s
Mineração Riacho dos Machados (MRDM), a wholly owned subsidiary of Equinox Gold.
Brief Description
RDM is is a conventional openpit and carbon-in-leach operation.
Brief History
Companhia Vale do Rio Doce (CVRD), now Vale, discovered the MRDM deposit in early 1986. CVRD operated the property as an openpit gold mine and heap-leach operation until closure in 1997.
The mine remained idle from 1997 until October 2008, when Carpathian Gold Inc. acquired the mineral rights and started prospecting and exploration. Carpathian restarted the mine in March 2014.
In April 2016, Brio Gold Inc acquired the mine from Carpathian. Leagold acquired the mine thereafter through the acquisition of Brio in May 2018.
In March 2020, Equinox and Leagold completed an at-market merger. As a result, the operating entity MRDM is now a wholly owned subsidiary of Equinox.
Primary Metals/Minerals
Gold.
Secondary Metals/Minerals
None stated.
Geology/Mineralisation
The RDM gold deposit occurs in the north-south-trending Araçuaí Fold Thrust Belt along the eastern margin of the São Francisco craton, a major Archean-age basement block that underlies more than one-million square kilometres in eastern Brazil.
The Araçuaí Fold belt is 15 km to 45 km wide and comprises a series of meta-volcanic/meta-sedimentary rocks of late Archean to late Proterozoic age.
The principal host for the gold mineralisation is the quartz-muscovite schist of the Riacho dos Machados group. Mineralisation occurs in a belt of hydrothermally altered rock developed along a district-scale shear zone and in the hydrothermal/shear zone. Gold grades are closely related to the sulphide content, especially arsenopyrite.
Reserves
Total proven and probable reserves as at December 16, 2020, were estimated at 17.55-million tonnes grading 0.99 g/t gold.
Resources
Total measured and indicated resources as at December 16, 2020, were estimated at 20.62-million grading 1.03 g/t gold. Inferred resources were estimated at 3.61-million tonnes grading 1.94 g/t gold.
Mining Method
Conventional openpit.
Major Infrastructure/Equipment
RDM includes an openpit mine, openpit waste storage facilities, internal mine property roads, processing facilities, offices and support buildings, water wells, an electrical power grid, an access road, transportation and shipping facilities, communications equipment and a tailings storage facility.
Mining equipment includes diesel drill rigs, hydraulic excavators and mechanical rear-dump trucks.
Prospects
Equinox temporarily suspended RDM operations in May 2022.
Contact Details
Equinox Gold
Tel +1 604 558 0560
Email info@equinoxgold.com
Website https://www.equinoxgold.com/
Sources
Equinox Gold. NI 43-101 technical report on the Riacho dos Machados Gold Mine, Minas Gerais, Brazil (October 22, 2021).
Equinox Gold. Website: https://www.equinoxgold.com/ [accessed May 24, 2022].
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















