https://www.miningweekly.com

RHA tungsten underground mine restart, Zimbabwe

22nd March 2019

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
RHA tungsten underground mine restart.

Location
Zimbabwe.

Project Owner/s
Premier African Minerals.

Project Description
The RHA tungsten mine has a significant underground operation, which is currently under care and maintenance.

Premier aims to re-establish production at RHA, with a technical and economic assess­ment proposing two production scenarios: underground production at a production rate of 6 000 t/m to 7 000 t/m or underground and openpit mining at a production rate of 6 000 t/m and 34 000 t respectively, with a plant processing rate of 40 000 t/m.

Premier is considering only the first option as a basis for restarting production at RHA. Existing resource estimates in the underground areas of RHA, excluding any openpit resources, indicate a mine life of more than ten years. In the underground production scenario, the mine life modelled has been limited to an initial 15 months of mining, including a month of rehabilitation for the underground mine and three months of development before the start of stoping. The reason for this limit at this time is that the results of drilling currently under way will guide the future underground development and mining rate.

The initial tungsten production is modelled to 2 700 t/m from underground mining, with the company incrementally increasing this to a steady-state production of 6 000 t in month 14. RHA also has sizable historical tailings deposits accumulated during historical production in the 1970s. The potential simultaneous processing of tailings and underground ore has also been examined in-house by Premier and has not been independently reviewed.

The company undertook an assessment to determine the tungsten resources contained in the tailings and conducted a comprehensive sampling programme to determine the size fraction, grade and potential in situ resource. The results of the sampling programme concluded that 86.1% of the material was above 45 µm, which is a suitable size for gravity concentration. The company has estimated that it can produce a tonne of concentrate from the tailings for 59% tungsten. These results have not yet been independently reviewed. Considering these favourable economics, the company has concluded that it should combine the reprocessing of these tailings with underground mining operations as and when they restart.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
The total underground mining cost, according to the economic and technical assessment, is estimated at $1.06-million.

Planned Start /End Date
Not stated.

Latest Developments
Premier African Minerals has received notice from the Zimbabwe Ministry of Industry, Commerce and Enterprise Development that is has secured a proposed investment of $6-million for its RHA tungsten project.

The funds will be used for the recommissioning of mining operations, subject to the completion of necessary agreements.

Further, Zimdiv Holdings, a wholly owned subsidiary of Premier and which manages the RHA mine, will be awarded another management agreement on similar terms to that of the current management agreement, which was entered into in September 2013.

The company will provide further updates once the agreements have been signed.

Key Contracts and Suppliers
Bara Consulting (technical and economic assessment).

On Budget and on Time?
Not stated.

Contact Details for Project Information
Premier African Minerals, email info@premierafricanminerals.com.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Sika South Africa
Sika South Africa

Sika South Africa is a trusted partner for the nation’s infrastructure, commercial, residential, and industrial sectors.

VISIT SHOWROOM 
ECG Engineering
ECG Engineering

ECG provides specialised electrical engineering services to the Mining, Utilities, Materials Handling and Industrial industries, with extensive and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.043 0.621s - 111pq - 2rq
Subscribe Now