Resgen committed to Boikarabelo development
PERTH (miningweekly.com) – The chairperson of dual-listed Resource Generation (Resgen), Denis Gately has told shareholders that the company is committed to the development of the Boikarabelo coal mine, in South Africa.
Addressing the firm’s annual general meeting (AGM) on Wednesday, Gately said that despite Resgen's best efforts to date, financing and construction of the mine had taken longer than expected.
“My goal had been to stand before you at this AGM and say that we are funded and under construction. All of the efforts of management and the board have been directed at achieving that goal.
“Unfortunately, we have not succeeded. But we remain committed to achieving development of the mine in the very near term, and we continue to push on with all the necessary contractual and financial arrangements required to achieve that goal.”
Resgen initially aimed to deliver first coal at Boikarabelo in the final quarter of 2018, but with financing discussions set to close by March 2017, first coal is now only scheduled for the first quarter of 2019.
The Boikarabelo project has a probable reserve of some 744.8-million tonnes, a measured resource of 1.1-billion tonnes, an indicated resource of 551.7-million tonnes and an inferred resource of 1.5-billion tonnes. The mine will be developed using a two-phased approach, with the first phase delivering about 14-million tonnes of run-of-mine coal a year, which will equate to about six-million tonnes of product coal. Phase 2, planned for 2022, involves ramping up production to 20-million tonnes of product thermal coal.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation