Razorback iron-ore project, Australia

Name of the Project
Razorback iron-ore project.
Location
South Australia.
Project Owner/s
Magnetite Mines.
Project Description
A new prefeasibility study has shown the potential for the production of a superpremium, high-grade (67.5% to 68.5% iron) magnetite concentrate from the Razorback project.
The study confirms the opportunity to fast-track a high-return, long-life development of the large-scale resource at Razorback using a staged approach to produce an attractive concentrate.
The PFS is based on a robust 473-million-tonne ore reserve within a much larger resource of three-billion tonnes.
The base case envisages a 12.8-million-tonne-a-year plant, producing 1.9-million tonnes of superpremium concentrate.
At an increased throughput of 15.5-million tonnes, production is estimated at 3.1-million tonnes a year.
The study has focused on using existing road, rail, port and utilities infrastructure in the region, and the immediate vicinity of the project, to ensure that capital expenditure requirements are kept to a minimum.
The project has an estimated 25-year mine life.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
In the long life optimised case, the project has a net present value of A$669-million and an internal rate of return of 20%.
Capital Expenditure
Capital expenditure is estimated at between A$572-million and A$675-million.
Planned Start/End Date
First shipment of premium concentrate is expected at the end of 2024.
Latest Developments
Magnetite Mines has reported that preparation for a prompt start of a definitive feasibility study is well advanced, with further drilling, testwork, metallurgical investigation and engineering work plans in progress.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Magnetite Mines, tel +61 8 8427 0516.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation
















