Platinum market to remain in deficit in 2016/17 amid lower capex
The reduction in capital expenditure (capex) by South Africa’s platinum producers will limit output of the precious metal by as much as 16% in 2016 and 2017, compared with 2015 levels, a World Platinum Investment Council- (WPIC-) commissioned report, compiled by Venmyn Deloitte, projects.
The study, which tracks capital investment by producers over a 20-year period, estimates a decline in platinum output of more than 600 00 oz/y in 2016, owing to reduced capex.
“Such a fall will support ongoing deficits in the platinum supply-demand balance, even without growth in platinum demand,” the report states.
It further outlines that platinum production from South Africa has declined by over 500 000 oz/y, or 11%, from 2008 to 2013.
Over the same five-year period, capital investment in the South African platinum mining sector has declined by more than 40%, from R30-billion a year to R17-billion. Capital investment in 2014 was R13-billion, while published capital investment estimates for this year stand at R11-billion.
“We believe the decline in refined platinum production from South Africa associated with reduced capex will continue. This is in contrast to some surprising assertions in the market that South African platinum output is likely to rise over the next two years.
“The analysis by Venmyn Deloitte demonstrates that using capital intensity alone as an indicator, production in 2016 and 2017 is likely to be well below current levels,” WPIC research director Trevor Raymond says.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation















