Name of the Project
Pituffik titanium project.

Location
Greenland.

Client
FinnAust Mining.

Project Description
Pituffik is an advanced-stage titanium project, comprising three main target areas along more than 80 km of coastline historically proven to contain large and high-grade accumulations of primary ilmenite occurring as placer deposits in:
• raised beaches, containing ilmenite accumulations across widths of more than 1 km, of unknown depths, along more than 20 km of coastline;
• active beaches, which refer to the area seaward of the frontal dunes, including the beach, tidal zones and surf zone – historically, samples from this area have achieved 70% ilmenite by weight; and
• drowned beaches, which refer to the areas seaward of active beaches.

Successful testwork has demonstrated that the project could produce a gravity-separated concentrate that compares favourably to existing ‘hard rock’ sources of ilmenite.

Overall composition of the ilmenite has indicated that it should be readily soluble in sulphuric acid at high process efficiency, making it suitable for all digestion process options.

All chemical analyses have shown a consistent ilmenite composition across the entire project area. Elements that could adversely impact on final pigment quality, particularly whiteness and yellowness, are comparable to existing commercial products. Further, radioactive components and acid-insoluble minerals are better than industry benchmarks for sulphate ilmenite.

Jobs to be Created
Not stated.

Net Present Value/Internal Rate of Return
Too early to state.

Value
Too early to state.

Duration
Too early to state.

Latest Developments
Work towards determining the Pituffik resource potential is continuing, with the maiden Joint Ore Reserves Committee-compliant resource expected later this year, ahead of the start of bulk sampling in 2017.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
FinnAust, tel +44 207 907 9326 or fax +44 207 681 3861.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Lilak Aluminium
Lilak Aluminium

For over 15 years, Lilak Aluminium, a trusted leader in architectural extrusion supply, has delivered excellence to businesses like yours.

VISIT SHOWROOM 
Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.044 0.066s - 111pq - 2rq
Subscribe Now