Pilot Mountain tungsten project, US

12th October 2018

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Pilot Mountain tungsten project.

Location
Nevada, US.

Client
Thor Mining.

Project Description
A scoping study has shown the potential for at least a medium-term life on one, and potentially two, of the four tungsten deposits at the Pilot Mountain project. The study proposes the simultaneous exploitation of the Desert Scheelite and Garnet operations.

Desert Scheelite is expected to have a mine life 12 years, with openpit mining over 11 years and one additional year to complete proces-sing. Total forecast openpit production is estimated at 7.5-million tonnes.

Contract mining is planned using conventional opencut mining methods, and drill-and-blast, followed by excavation and haulage. A series of pit cutbacks is scheduled to deliver the forecast 650 000 t/y mine production, which will generate about 1 000 t/y of scheelite.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Project payback of 36 months is forecast on the base case, reducing to less than 18 if current metallurgical testwork, is successful in improving recovery to 85% or above.

Value
Capital expenditure of the Desert Scheelite project is estimated at $30-million to $35-million.

Duration
Not stated.

Latest Development
The scoping study outcomes support a deci-sion to start a more detailed prefeasibility study to progress the project along the development pathway.

Key Contracts and Suppliers
Resource Evaluation Services (resource estimates); AVCS (Desert Scheelite scoping study, mine planning and capital costs); NA Degerstrom (operating parameters and costs); Guangzhou Research Institute of Non-Ferrous Metals (metallurgical processes and outcomes); and Practical Mining (garnet evaluation).

On Budget and on Time?
Not stated.

Contact Details for Project Information
Thor Mining, tel +61 8 7324 1935, fax +61 8 8351 5169 or email corporate@thormining.com.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 
Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.042 0.38s - 111pq - 2rq
Subscribe Now