Pilgangoora lithium/tantalum expansion project, Australia

27th July 2018

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Pilgangoora lithium/tantalum expansion project.

Location
Western Australia.

Client
Pilbara Minerals.

Project Description
A prefeasibility study has outlined a compelling business case for starting the expansion of the Pilgangoora lithium/tantalum project at five-million tonnes a year of run-of-mine ore production and processing capacity within months of starting production of spodumene concentrate from the two-million-tonne-a-year Stage 1 operation.

The project has proven and probable reserves of 80.3-million tonnes grading 1.27% lithium oxide (Li2O), 123 parts per million of tantalum pentoxide (Ta2O5) and 1.08% iron oxide.

The plant expansion will entail modifications to expand the existing Stage 1 circuit to 2.5-million tonnes a year (Train 1), and the construction of a similar 2.5-million-tonne-a-year circuit (Train 2) to achieve a total nameplate capacity of five-million tonnes a year.

Production of about 800 000 t/y of high-quality spodumene concentrate is expected once the plant has achieved nameplate capacity of five-million tonnes a year.

The flowsheet has been designed to target two product streams – chemical-grade spodumene at 6% Li2O and low iron; and tantalite concentrate at 25% to 30% Ta2O5.

Tailings are expected to be produced at 65% to 68% solids concentration at 4.25-million tonnes a year (Stage 2) for the life-of-mine, with the total storage requirement increasing from 58.8-million tonnes to 68.3-million tonnes.

The tailings management facility (TMF) will be expanded by increasing the height of cells 1, 2 and 3 on the original integrated waste landform design on a staged basis.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The Stage 2 expansion project has an after-tax net present value, at a 10% discount rate, of A$2.1-billion and an internal rate of return of 56%, with a payback of three years.

Value
Stage 2 has a capital development estimate of A$207-million.

Duration
Construction is expected to start by the fourth quarter of 2018 and commissioning from the fourth quarter of 2019.

Latest Developments
Pilbara Minerals has produced its first coarse concentrate from the Pilgangoora lithium project.

Production followed the first fines concentrate last month, and resulted from the coarse circuit being brought on line.

About 1 000 t of coarse and fines concentrate have been produced to date.

With each primary subcircuit of the Pilgangoora concentrator having now been operated, commissioning of the plant can progress to completion, then to product specification optimisation and production ramp-up.

As part of completing the commissioning process and product specification optimisation, fines concentrate will now undergo final processing through the dressing circuit, which is one of the last subsystems to be commissioned within the concentrator.

Fines concentrate will be assayed following final commissioning of the spodumene concentrate dressing circuit. Assays are awaited for the coarse-concentrate production.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Pilbara Minerals, tel +61 8 6266 6266 or fax +61 8 6266 6288.

 

 

 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

SafeQuip
SafeQuip

SafeQuip is a leading distributor and manufacturer of fire safety solutions, offering a comprehensive range of products designed to meet all...

VISIT SHOWROOM 
Rosond
Rosond

ROSOND provides fast, efficient, safe, and cost-effective drilling and grouting services to mining and exploration industries throughout Africa.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.043 0.754s - 111pq - 2rq
Subscribe Now