Piauí nickel project, Brazil – update

Photo by Brazilian Nickel
Name of the Project
Piauí nickel project (PNP).
Location
North-east Brazil.
Project Owner/s
Brazilian Nickel.
Project Description
The PNP is a nickel laterite heap-leaching project and is the world’s first standalone nickel laterite heap leaching operation.
The project has a resource of 72-million tonnes at 1% nickel and 0.05% cobalt, with 73% of the resource in the measured category, and is expected to produce an average of 25 000 t/y of nickel and 900 t/y of cobalt.
PNP1000 will initially ramp up to produce 1 400 t/y of nickel in nickel hydroxide product and 35 t of cobalt a year from 2023; this is the first step towards much high production rates later.
Mining will be a straightforward openpit extraction process.
Potential Job Creation
The PNP1000 operation has provided 215 jobs, of which more than 70% have been filled by residents of the local communities.
Net Present Value/Internal Rate of Return
Not stated.
Capital Expenditure
Current in-house company estimates indicate that the project is expected to have an all-in financing requirement of $465-million.
Planned Start/End Date
According to current estimates, production is targeted for the end of 2024.
Latest Developments
Following an 18-month construction and commissioning period, continuous nickel production has begun at the PNP.
Further work still needs to be completed on the cobalt circuit over the next four to six months. As there is much less cobalt in the ore than nickel, Brazilian Nickel CEO Mike Oxley has said it will take some time for cobalt tenors in solution to reach the required levels for cobalt hydroxide production to begin. A further announcement on the start of cobalt hydroxide production is expected later this year.
Key Contracts, Suppliers and Consultants
SNC Lavalin (BFS).
Contact Details for Project Information
Brazilian Nickel, email info@brnickel.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation
















