Patterson Lake South – Triple R uranium project, Canada
Name and Location
Patterson Lake South (PLS) – Triple R uranium project, Canada.
Client
Fission Uranium.
Project Description
A preliminary economic assessment (PEA) on the PLS project envisages a standalone mine and mill operation, which includes the development and extraction of the R00E and R780E zones of the Triple R deposit, and excludes the recently discovered R600W zone.
The study envisions a combination of openpit and underground mining, together with a dyke system – comprising a dyke and slurry wall – for water control. High-grade mineralisation containing more than 4% uranium (U3O8) is captured within the openpit, eliminating the need for expensive, specialised underground mining methods.
This hybrid openpit and underground mining results in an operating expenditure cost of $14.02/lb U3O8 over the life-of-mine, making Triple R potentially one of the lowest-cost uranium producers in the world.
These results might be further enhanced with the addition of the R600W zone discovered 495 m along strike to the west of the R00E zone.
The project has a mine life of 14 years producing an estimated 100.8-million pounds of yellowcake at a metallurgical recovery of 95%, with 77.5-million pounds of U3O8 recovered in the first six years of production. Average yearly production of 7.2-million pounds of U3O8 is estimated over the life-of-mine.
Net Present Value/Internal Rate of Return
The project has a base case pretax net present value, at a 10% discount rate, of $1.81-billion and a base case pretax internal rate of return of 46.7%, with payback estimated at 1.4 years.
Value
Initial capital costs are at $1.1-billion.
Duration
Not stated.
Latest Developments
None stated.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Fission Uranium investor relations, Rich Matthews, tel +1 877 868 8140 or email rich@fissionuranium.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation