Paraburdoo stacker project, Australia
Name of the Project
Paraburdoo stacker project.
Location
Pilbara, Western Australia.
Client
Rio Tinto.
Project Description
The project will replace the original stackers – large pieces of machinery used to evenly distribute ore into stockpiles – at the Paraburdoo mine.
The old stackers were part of the mine’s original infrastructure, stacking the very first load of iron-ore from Paraburdoo in 1972.
Potential Job Creation
The project will create about 100 jobs.
Net Present Value/Internal Rate of Return
Not stated.
Value
The project involves an investment of about $39-million.
Duration
Installation and commissioning completed by 2020.
Latest Developments
The design of the new stackers is under way and fabrication is expected to begin later this year.
Key Contracts and Suppliers
Tenova TAKRAF (design and implementation phases) and Paradigm Engineers (electrical engineering design and control system programming services, as well as the supply of electrical equipment).
On Budget and on Time?
Too early to state.
Contact Details for Project Information
Rio Tinto investor relations, Natalie Worley, tel +61 3 9283 3063.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















