Pakrut gold project, Tajikistan
Name and Location
Pakrut gold project, Tajikistan.
Client
Kryso Resources.
Project Description
The Pakrut project is situated in the southern portion of the Tien Shan fold belt, a belt of folded rocks that extends from near the Aral sea, in Uzbekistan, through the northern part of Tajikistan into China and then into Mongolia. The Tien-Shan fold belt contains the world’s second-largest known gold resources after the Witwatersrand in South Africa.
An operation with a 19-year mine life and an average gold production of 82 000 oz/y in the first four years has been proposed.
The project is based on the development of Pakrut as an underground mine using sublevel open stoping, with cemented hydraulic fill as the primary mining method. The orebody will be accessed through a decline, starting at 2 265 m above sea level and running down to 1 810 m. In addition, a raise is proposed from the 2 300 m level to enable mining up to the surface at about 2 400 m above sea level.
Value
The expected capital expenditure cost of Phase 1, which includes construction, working capital and allowances for cost overruns, is $176.53-million. Phase 2 will cost an estimated $46.5-million, which will be funded from operating cash flow.
Duration
The mine will be brought into production in 2014.
Latest Developments
The procurement and delivery of the plant and machinery are progressing.
Key Contracts and Suppliers
China No 15 Metallurgical Construction Group (construction of underground mine).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Kryso Resources, tel +44 20 7349 9160, fax +44 20 7352 6919, email info@kryso.com.
China No 15 Metallurgical Construction Group, tel +86 27 51015600.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation
















