P680 spodumene project, Australia
Name of the Project
P680 spodumene project.
Location
Australia.
Project Owner/s
Pilbara Minerals.
Project Description
The project aims to increase the Pilgangoora Operation’s nameplate production capacity from about 580 000 t/y to 680 000 t/y of spodumene concentrate (P680 project).
The P680 project includes primary rejection, and crushing and ore sorting to deliver a total nameplate production capacity at the Pilgangoora operation of between 640 000 t/y to 680 000 t/y.
The primary rejection facility includes an additional heavy-media separation (HMS) circuit, installed between the coarse-ore stockpile and existing Pilgan plant HMS circuit, which will produce a coarse, low-grade lithia reject material, representing 20% to 25% of plant feed.
The primary rejection circuit will increase spodumene concentrate production from the Pilgan pant by about 100 000 t/y.
The crushing and ore-sorting facility will replace the existing contracted crushing services over time and is expected to lower operating costs, while providing increased crushing capacity of about five-million tones a year to satisfy future expansion plans for the proposed P1000 project.
P1000 has a targeted production capacity of up to one-million tonnes a year and remains subject to a separate final investment decision, as well as suitable market conditions and regulatory approvals.
The final investment decision for the P1000 project is targeted for late December.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
Not stated.
Capital Expenditure
The project requires a capital investment of $297.5-million, including $50-million of pre-investment capital towards future expansions of up to one-million tonnes a year of spodumene concentrate production – the P1000 project.
Planned Start/End Date
Commissioning of the primary rejection facility is expected to start in the September quarter of 2023, with additional production capacity to follow three months later.
Commissioning of the crushing and ore-sorting facility is expected in the fourth quarter of 2023, with dull capacity expected in the second quarter of 2024.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Pilbara Minerals, tel +61 8 6266 6266.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation