Oyu Tolgoi copper/silver/gold complex, Southern Gobi region, Mongolia.

Client
Turquoise Hill, a Rio Tinto subsidiary (66%) and Erdenes Oyu Tolgoi (34%).

Project Description
Oyu Tolgoi has the mineral resources to become one of the world’s top three copper/gold producers.

The project entails the construction and operation of an initial concentrator facility that will process 100 000 t/d of ore, or 36.5-million tons a year. By the end of the fifth year of operation, the concentrator’s capacity will be expanded to 160 000 t/d, or 58-million tons a year.

Under the common start-up plan, ore will initially be sourced from the openpit mine on the Southern Oyu deposits, while the adjacent higher-grade underground mine, on the Hugo North deposit, will be developed to full production of 95 000 t/d.

The mine is expected to produce more than 1.2-billion pounds (544 000 t) of copper, three-million ounces of silver and 650 000 oz/y of gold in the first ten years of operation. Seven years later, at its peak, it is expected to produce about 1.7-billion pounds of copper and one-million ounces of gold.

Estimates indicate that Oyu Tolgoi contains 2.7-million tonnes of recoverable copper and 1.7-million ounces of recoverable gold in reserves. The scale of deposits at Oyu Tolgoi is expected to enable the project to operate for more than 50 years. The underground section of the mine is estimated to contain up to 80% of the value of the project.

Net Present Value/Internal Rate of Return
Not stated.

Value
The final cost of the Phase 1 capital project was an estimated $6-billion.

The underground expansion of the project is expected to cost an estimated $4-billion.

Duration
First ore was processed through the concentrator on January 2, 2014, and the first copper/gold concentrate was produced on January 31.

Initial production from the underground mine is expected in 2016 and it is expected to reach full capacity in 2021.

Latest Developments
Rio Tinto is lining up project financing for the long-delayed expansion of its Oyu Tolgoi copper mine and is expected to make a final investment decision early next year, a senior executive has said.

The mine, which started producing from an openpit more than two years ago, is the biggest single foreign investment in Mongolia, and resolution of disputes over its second phase in May revived hopes for a string of other stalled mining projects.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
The underground expansion project has been delayed by several years, owing to a tax dispute with the Mongolian government.

Contact Details for Project Information
Oyu Tolgoi, tel +976 11 331880, fax +976 11 331890 or email OTLLCinfo@ot.mn.
Turquoise Hill Resources media contact Tony Shaffer, tel +1 604 648 3934 or email tony.shaffer@turquoisehill.com.
SGS manager on-site laboratories Pierrette Prince, tel +1 416 445 5755, fax +1 416 445 4152 or email pierrette.prince@sgs.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Sika South Africa
Sika South Africa

Sika South Africa is a trusted partner for the nation’s infrastructure, commercial, residential, and industrial sectors.

VISIT SHOWROOM 
ECG Engineering
ECG Engineering

ECG provides specialised electrical engineering services to the Mining, Utilities, Materials Handling and Industrial industries, with extensive and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.05 0.928s - 111pq - 2rq
Subscribe Now