https://www.miningweekly.com

Oropesa tin project, Spain

Image of tin ore

14th June 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Oropesa tin project.

Location
Cordoba province, in Andalucía, Spain.

Project Owner/s
Elementos.

Project Description
An optimisation study completed in March 2022 confirmed a robust case for a 1.25-million tonnes a year run-of-mine rate, with average contained tin production projected at 3 350 t/y over a 13-year mine life.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The optimisation study, based on a conservative tin price of $32 50/t, demonstrates a real, ungeared pre- and after-tax net present value, at an 8% discount rate, of about $219-million and $149-million respectively. 

The pre- and after-tax internal rate of return (IRR) is about 46% and 38% respectively. 

The capital payback period is estimated at 2.5 years.

Capital Expenditure
$86-million, including a 20% contingency.

Planned Start/End Date
Elementos is targeting primary approvals and a final investment decision by the end of 2025, ahead of planned delivery of Oropesa’s first tin concentrate in late 2027.

Latest Developments
Elementos plans to complete the definitive feasibility study by the end of 2024, after having secured administration support in May 2024 for a modified project layout.

The company plans to open a new administrative file, the first step in the resubmission of primary licence documentation, which it estimates will be resubmitted in about four months. Elementos is confident that Oropesa’s approvals can be achieved within 15 to 18 months.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Elementos, tel +61 7 2111 1110 or email admin@elementos.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Kriel Occupational Health Centre
Kriel Occupational Health Centre

Occupational health services, mobile clinics, wellness campaigns, aviation.

VISIT SHOWROOM 
Advanced Fire Suppression Technologies
Advanced Fire Suppression Technologies

Established on 1 March, 2000, by Barries Barnard, Advanced Fire Suppression Technologies (AFST) and the Advanced Group stands as Sub-Saharan...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.049 0.074s - 111pq - 2rq
Subscribe Now