Orom-Cross graphite project, Uganda – update

Name of the Project
Orom-Cross graphite project.
Location
Uganda.
Project Owner/s
Blencowe Resources.
Project Description
Orom-Cross is a large, shallow openpit deposit with an estimated overall resource of between two- and three-billion tonnes of graphite. A total of 16.3-million tonnes have been drilled to Joint Ore Resource standard.
A preliminary economic assessment (PEA) envisages an openpit, owner-operated mining operation.
The plant will contain separate circuits that will, ultimately, deliver an average of 75 000 t/y, comprising four separate end-products – jumbo, large, medium and small flake-size concentrates.
Potential Job Creation
A workforce of about 45 will be on site at any time, some of whom will be a fly-in, fly-out contingent from international locations.
Net Present Value/Internal Rate of Return
The project has a net present value, at an 8% discount rate, of $317-million and an internal rate of return of 49%, with a payback on capital of four years.
Capital Expenditure
The project has an initial capital cost of $80-million, inclusive of 15% contingency.
Planned Start/End Date
The company aims to produce its first graphite concentrates from a pilot plant by 2023, while full production from a main plant is expected from 2025.
Latest Developments
Blencowe Resources has increased its total resource by 50% to 24.5-million tonnes grading 6% total graphite content, which contains sufficient measured and indicated resources for the first 15 years of the life-of-mine at the Orom-Cross graphite project.
The company has increased indicated and measured resources by 340% to 13.2-million tonnes, providing a higher level of accuracy and confidence in the deposits to be mined.
It also completed a comprehensive infill drilling programme in the second half of 2021. The results have significantly increased the mineral resource potential and confirmed the robustness of the two higher-grade zones within the main Northern Syncline deposit on the project.
The measured, indicated and inferred resources start from the surface outcrop to at least a depth of 30 m, and the orebody remains open below, representing future exploration potential.
The company has said the quality of the mineralisation lends itself to low-cost production.
Blencowe initially targeted a mineral resource of 20-million tonnes from Phase 6 of its infill drilling programme, with ten-million tonnes being in the measured and/or indicated categories. However, this expectation has been exceeded and will contribute to a positive prefeasibility study once published in mid-2022.
Key Contracts, Suppliers and Consultants
Battery Limits (PFS).
Contact Details for Project Information
Blencowe Resources, tel +44 1624 681 250 or email info@blencoweresourcesplc.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation