Odysseus nickel project, Australia
Name of the Project
Odysseus nickel project.
Location
Odysseus is located on a granted mining lease that is part of the high-grade Cosmos nickel complex, which is situated 30 km north of Leinster, in Western Australia.
Client
Western Areas.
Project Description
A prefeasibility study (PFS) has shown that re-opening the Cosmos nickel complex and mining the Odysseus deposit, which is located 400 m below the existing Cosmos underground infrastructure, will generate strong returns with potential for further growth, given recent exploration results and other processing optimisations.
The project currently comprises 7.3-million tonnes of indicated and inferred Joint Ore Reserves Committee-compliant resources at a grade of 2.4% nickel for 174 000 t of contained nickel.
The project comprises mining 4.9-million tonnes of ore at a nickel grade of 2.3% from the Odysseus south and north deposits – situated 1 000 m below surface – using an extension of the existing Cosmos decline and processing the ore using the existing plant and infrastructure.
Odysseus will be accessed through a new central decline from the existing underground infrastructure, splitting into separate accesses for each of the south and north zones.
The primary mining method will be sublevel open stoping with paste fill using longitudinal ore drives on a 25 m crosscut spacing.
The south and north zones will be mined in a bottom-up sequence, with the north zone being mined from south to north.
Primary ventilation includes the completion of a partially reamed 5-m-diameter exhaust raise to surface and a new surface intake shaft completed in two legs using raisebore.
The Odysseus South zone will require the establishment of two destress slots in the central levels early in the mining schedule and mass blasting of both slots simultaneously prior to paste filling. The destressing slots will enable Western Areas to maximise recovery of ore from the south zone. The existing Cosmos processing plant will be refurbished and is rated at 430 000 t/y for disseminated ore, which is sufficient to handle mine output for the first 12 months of operations.
In the latter half of the first year of operation, the Cosmos processing plant will undergo an expansion to accommodate increased mine output of 750 000 t/y.
The project has an initial 7.5-year mine life for total life-of-mine ore production of 4.9-million tonnes at a grade of 2.3% nickel.
Jobs To Be Created
Not stated.
Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 7% discount rate, of $292-million and an internal rate of return of 28%, with a payback of 3.5 years from the start of production.
Value
Preproduction capital expenditure has been estimated at between $190-million and $210-million, including PFS, definitive feasibility study (DFS) and contingency costs.
The Cosmos processing plant will be refurbished at an estimated cost of $6.2-million. The expansion of the processing plant is estimated at $21.5-million.
Duration
First ore is expected to be mined in the fourth quarter of 2020, with concentrate expected to be delivered in the first quarter of 2021.
Latest Developments
With the successful completion of the PFS, the Western Areas board has approved the project to progress to the DFS stage.
The DFS is expected to start in the second quarter of 2017 at a cost of between $5-million and $6-million.
The DFS is expected to be completed in the first quarter of 2018.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Western Areas, tel +61 8 9334 7777, fax +61 8 9486 7866 or email info@westernareas.com.au.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation