https://www.miningweekly.com

Nornickel completes upgrade of Arctic-based concentrator

7th June 2017

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

JOHANNESBURG (miningweekly.com) – Nickel and palladium miner Norilsk Nickel (Nornickel) has completed the Talnakh concentrator modernisation project, in Russia’s Arctic region, the company reported on Wednesday.

The upgrade, which cost 47-billion roubles, expanded the concentrator’s capacity by 34% from 7.6-million tonnes a year to 10.2-million tonnes a year.

The Talnakh concentrator, which forms part of Nornickel’s Polar division, reached the targeted throughput capacity in March, and the design parameters in April.

“The upgrade of the Talnakh concentrator is a key element of our downstream reconfiguration programme aiming at raising the operating efficiency of our business and reducing the environmental footprint of Nornickel's production sites,” Nornickel first VP Sergey Dyachenko said in a statement.

Launched in 2014, the modernisation project was split into two stages and also involved the construction of major engineering infrastructure for a new tailings pit. The concentrator's reconstruction and technical upgrade project involved the expansion of the main building, installation of a semiautogenous grinding mill by Metso Minerals, flotation machines, and fine grinding mills. The new tailings pit has a capacity of about six-million tonnes a year using a closed water circuit, which will significantly reduce fresh water usage and improve the environmental impact.

The concentrator, built in 1981, processes ores mined at the Talnakh and Oktyabrskoye deposits to produce nickel and copper concentrates.

Edited by Creamer Media Reporter

Comments

Showroom

Actom image
Actom

Your one-stop global energy-solution partner

VISIT SHOWROOM 
Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

PGMs and green hydrogen make headlines
PGMs and green hydrogen make headlines
19th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.191 0.233s - 105pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: