Nickel West still eyeing growth options
PERTH (miningweekly.com) – Diversified miner BHP’s nickel arm, Nickel West, has reaffirmed its pathways to increasing production in Western Australia, including the development of new mines and the expansion of existing operations.
Speaking at the Paydirt Nickel conference, BHP Nickel West’s head of integrated operations, Karl Stokes noted that first ore from the Yakabindie project would be delivered to the Mt Keith concentrator in December this year, with the mine making up the primary source of mill feed at Mt Keith from 2021 onwards.
The Western Australian Environmental Protection Authority at the end of last year gave Nickel West clearance to build the nickel sulphide mine near the existing Mt Keith concentrator, to produce some 9.6-million tonnes of nickel ore a year.
The ore will be trucked to the existing Mt Keith for processing, and is expected to extend the life of the Mt Keith nickel operation by 12 years.
Stokes on Tuesday said that Nickel West was also making inroads at both the Venus underground and at the B11 block cave operation near the Leinster smelter, with undercut work at the B11 project expected to start in the second half of 2020, subject to government approvals.
In addition to the work being conducted at the mines, Nickel West is also focusing attention on debottlenecking activities at both the Kwinana refinery and Kalgoorlie smelter, with the miner expected to incrementally invest capital to increase production capacity at the downstream operations.
First production from the nickel sulphate plant at the Kwinana nickel refinery is expected in the first half of 2020.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation