https://www.miningweekly.com

New Elk coking coal project, US

1st May 2020

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
New Elk coking coal project.

Location
The project is located in south-east Colorado, in the US.

Project Owner/s
Allegiance Coal entered into binding agreements to acquire New Elk in January 2020, on condition it raises the startup capital required by July 14, 2020.

Project Description
Following the results of the New Elk feasibility study announced in November 2019, Allegiance has updated the study, simplifying the mine plan in the early years of production to reduce startup and sustaining capital.

The project’s total Joint Ore Reserves Committee-compliant coal resources of 267.6-million tonnes have remained the same, while saleable coal reserves have decreased from 45-million tonnes in the feasibility study to 23-million tonnes in the updated study.

Based on the updated coal reserves, the project’s mine life has decreased from 23 years to 15 years, and saleable coal production from two-million tonnes to 1.4-million tonnes.

Coal will be mined using continuous miners adopting the place change room-and-pillar method.

Rehabilitation and operating plans for the coal handling preparation plant (CHPP) have remained unchanged under the updated study. The CHPP has a nameplate feed rate of 727 t/h.

Potential Job Creation
An estimated 210 job are expected to be created.

Net Present Value/Internal Rate of Return
The project’s net present value has decreased from A$1.17-billion, at an 8% discount rate in the feasibility study, to A$560-million at an 8% discount rate in the updated study. The internal rate of return has decreased from 130% to 121%.

Capital Expenditure
The updated study has resulted in a reduction in startup capital, including working capital, from $56-million to $40-million.

Planned Start/End Date
Assuming that Allegiance completes the acquisition of New Elk within the current timeframes, the company is hoping to start production at the mine by the third quarter of 2020.

Latest Developments
None stated.

Key Contracts and Suppliers
Stantec (updated study) and Performance Industries (CHPP review).

Contact Details for Project Information
Allegiance Coal, tel +61 2 9233 5579 or email info@allegiancecoal.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Sika South Africa
Sika South Africa

Sika South Africa is a trusted partner for the nation’s infrastructure, commercial, residential, and industrial sectors.

VISIT SHOWROOM 
ECG Engineering
ECG Engineering

ECG provides specialised electrical engineering services to the Mining, Utilities, Materials Handling and Industrial industries, with extensive and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.048 0.809s - 111pq - 2rq
Subscribe Now