https://www.miningweekly.com

New Century flags lower costs

9th April 2021

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) - Zinc miner New Century Resources has flagged improved economics for its 2021 financial year as the annual zinc concentrate benchmark treatment charge (TC) reduced by 47% compared with the 2020 benchmark.

The ASX-listed miner on Friday noted that the 2021 TC has been set at $159/t, compared with the $299.75/t set in 2020.

TC’s represented around 30% of the zinc miner’s C1 cost base in 2020, with the company telling shareholders that C1 costs are now expected to drop by around $0.14/lb as a result of the TC drop.

The company noted that in 2021, some 85% of its zinc concentrate shipments are anticipated to occur against contracts linked to an annual TC of $159/t, with the remaining product anticipated to ship against a variable spot TC, which currently stands at around $70/t.

The 2021 benchmark TC will be retrospectively applied from January 1, resulting in New Century receiving back-payment for shipments issued at higher TCs during the March quarter.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Sika South Africa
Sika South Africa

Sika South Africa is a trusted partner for the nation’s infrastructure, commercial, residential, and industrial sectors.

VISIT SHOWROOM 
ECG Engineering
ECG Engineering

ECG provides specialised electrical engineering services to the Mining, Utilities, Materials Handling and Industrial industries, with extensive and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.061 1.243s - 128pq - 2rq
Subscribe Now