https://www.miningweekly.com
Construction|Design|Engineering|PROJECT
Construction|Design|Engineering|PROJECT
construction|design|engineering|project

Nemaska Lithium eyes fresh steps to raise capital for Quebec project

13th June 2019

By: Reuters

  

Font size: - +

SANTIAGO – Nemaska Lithium may issue new shares, take on new debt or sell assets as it hunts for fresh capital to build a lithium project in Quebec that faces cost overruns of more than $300-million, head of investor relations Wanda Cutler said on Wednesday.

"Everything from M&A to more debt to equity is on the table," Cutler told the Fastmarkets Lithium Supply and Markets Conference in Santiago. "Over the next few months, we'll be making those decisions."

Nemaska is developing the Whabouchi hard rock lithium project in northern Quebec, one of North America's largest deposits of spodumene. A related processing plant is under construction near Montreal.

The company this year said it has faced cost overruns of more than $300-million as it works to build those facilities, part of a plan to supply the white metal for use in electric vehicle batteries.

Cutler said much of the cost overruns were due to "indirect" items that were not foreseen. For instance, Nemaska ended up having to build lodging at the mine for workers. The company had expected to lease the facility from a third party.

The chemical processing facility also has faced several design challenges, she said.

"In hindsight, perhaps on the chemical plant, the level of detailed engineering should have been a bit more advanced before we started construction," Cutler said.

The news comes after a prolific year of fundraising last year for Nemaska, when the company pulled in more than $1-billion in part from stock offerings.

Edited by Reuters

Comments

Showroom

Showroom image
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 
Actom image
Actom

Your one-stop global energy-solution partner

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (12/04/2024)
12th April 2024 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.079 0.117s - 107pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: